My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
020618
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2018 5:17:16 PM
Creation date
1/31/2018 1:30:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/6/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 7 <br />• Title Sheet, Legend and Notes <br />• Typical Cross Sections <br />• Improvement Plans <br />• Construction Details <br />• Storm Water Treatment Plan and Details <br />• Signing and Striping Plan <br />• Structural Pian <br />• Structural Details <br />• Landscape Plan <br />• Landscape Details <br />• Irrigation Plan <br />• Irrigation Details <br />• Electrical Plans <br />• Electrical Details <br />Engage a structural engineering subconsultant, Biggs Cardosa and Associates, to perform <br />structural calculations and prepare design drawings for a U-shaped trench which will retain soil <br />and act as a bio -filtration cell with underdrains. It is assumed that the wall will incorporate a <br />community inspired architectural treatment. <br />Engage an electrical engineering subconsultant, Belden Consulting Engineers, to perform <br />electrical calculations and prepare design drawings for on-site lighting, electric vehicle charging <br />stations, parking detection, irrigation controllers and other site appurtenances. <br />Vehicle charging stations will be specified on the plans as an off-the-shelf product to be installed <br />per the manufactures recommendations. The plans will permit the contractor to submit an <br />alternative system at the discretion of the engineer. <br />A draft of the technical specifications sections will be prepared and included with the submittal. <br />The technical specifications will reference City or Caltrans standard specifications sections for <br />the various items of work, with specific consideration for measurement and payment provisions. <br />Specifications for this task will be prepared in CSI format. <br />The Preliminary Estimate of Probable Construction Cost will be updated to reflect the <br />refinements from the Preliminary Design to the Preliminary PS&E (75%) Submittal. <br />165 City Storm Water Check List <br />Perform calculations and analysis related to storm water control requirements and complete the <br />City's Storm Water Check List. Demonstrate compliance with state, regional, and local <br />requirements through the city's process. <br />If required, engage Balance Hydrologics to perform Bay Area Hydraulic Model (BAHM) <br />modelling to determine hydromodification orifice configurations and demonstration compliance <br />with the Municipal Regional Permit (MRP). <br />
The URL can be used to link to this page
Your browser does not support the video tag.