My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
020618
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2018 5:17:16 PM
Creation date
1/31/2018 1:30:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/6/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 7 <br />141 Geotechnical Investigation <br />Engage a geotechnical engineering subconsultant, CaI Engineering and Geology to review <br />historic geological data, conduct field investigations and soils borings, perform laboratory testing <br />and prepare geotechnical recommendations. <br />CaI Engineering and Geology will obtain a permit from Zone 7 water to conduct boring <br />operations. <br />Six (6) borings to a depth of ten (10) feet are included in this task. All drilling spoils will be left on <br />site within the future construction footprint. <br />Environmental testing will be completed on soil samples collected from the parking lot. Tests will <br />include: <br />Cam17 Metals (EPA 200.8/6020) <br />BTEX & TPH as Gas (EPA 8021/8015) MTBE <br />TPH as Diesel (EPA 8015) <br />Total Petroleum Oil & Grease (EPA 1664/5520 E/B&F) <br />Volatile Organic Compounds (EPA 524.2/624/8260) <br />Geotechnical analyses will be completed to develop seismic design parameters and calculate <br />retaining wall loads and foundation capacities. A geotechnical report will be prepared in <br />conformance with Caltrans Division of Engineering Services' Foundation Reports for Earth <br />Retaining Systems (ERS) dated August 2015. <br />150 Preliminary Design (35%) <br />Develop Preliminary Plans to establish fundamental elements of the design. The Preliminary <br />Design Phase is intended to allow CITY, utility companies and other involved agencies to review <br />and comment upon the basic design concepts early in the process. The proposed plans for this <br />preliminary submittal include: <br />• Title/Index Sheet <br />• Typical Cross Sections <br />• Preliminary Improvement Plan <br />• Preliminary Stormwater Treatment Plan <br />• Preliminary Landscape Plan (no Irrigation) <br />• Preliminary Electrical Plan <br />Prepare a Preliminary Estimate of Probable Construction Cost based on items and quantities of <br />work shown on the Preliminary Plans and other anticipated improvements. Prices will be based <br />on the magnitude of the quantities, our experience with similar projects and engineer's <br />judgment. <br />160 Draft PSE (75%) <br />Based on comments received from Preliminary Design, advance the design to the point that all <br />major design issues and solutions are represented in the plans. The following types of plans <br />will be prepared: <br />
The URL can be used to link to this page
Your browser does not support the video tag.