My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
011618
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2018 4:22:06 PM
Creation date
1/10/2018 4:20:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/16/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pleasanton Downtown Specific Plan EIR <br /> Scope of Work <br /> TASK 4: CIVIL ENGINEERING (BKF) <br /> Objective: This task entails civil engineering services related to support of the Downtown <br /> Specific Plan Update. This scope assumes that BKF Engineers'services are limited to those <br /> expressly set forth in the scope. BKF shall have no other obligations or responsibilities for <br /> the project except as provided in this proposal letter, oras agreed to in writing.BKF will <br /> provide the scope of services consistent with,and limited to, the standard of care <br /> applicable to such services.Assumptions include: <br /> C Survey/ Field Visits: BKF has budgeted 8 hours for a field walk and existing <br /> conditions assessment, but has not included budget for survey services. <br /> o Utility Capacity Studies: BKF assumes that the City of Pleasanton can provide <br /> existing utility system map records and operational knowledge of the conveyance <br /> and collection systems (water, sewer, and storm drain) that can be used for <br /> assessment of probable infrastructure capability to serve the preferred plan at <br /> build-out. <br /> • Deliverables:BKF's deliverables will be limited to narrative reports and mark-ups of <br /> PDF's provided by others. <br /> A. Existing Conditions Report. BKF will develop a written narrative (word document) and <br /> sketches (PDF markup) for inclusion into the master document of the existing <br /> infrastructure conditions (water, wastewater, stormwater). D&B will incorporate this <br /> information and draft the sketches into graphic exhibits consistent with the overall <br /> document. Based on GIS information provided by the City, and map records provided <br /> by PGE, BKF will prepare graphical information for an exhibit of existing utility <br /> information. We will also interview City engineering and operation services staff to <br /> identify known deficiencies in the City utility infrastructure, which can be included in <br /> the Existing Conditions Report.We have budgeted for three meetings / interviews and <br /> one field walk of the plan area in this task. <br /> B. Preferred Plan Infrastructure Assessment.Based on information gathered in sub-task A, <br /> BKF will prepare an assessment of wet utility infrastructure upgrades needed to <br /> support buildout of the proposed land use program, including planning-level cost <br /> estimation. We include cost estimation of proposed typical streetscape infrastructure <br /> improvements based on a standard road diet. BKF will also provide technical review of <br /> infrastructure sections to support the EIR / CEQA process, and has budgeted for two <br /> meetings in this task. <br /> 2 = udget <br /> The total budget for the Scope of Work is $258,266. This budget includes cost of traffic <br /> counts and long-term noise measurements as stated in the Scope of Work, as well as a 12% <br /> contingency. <br /> -9- <br />
The URL can be used to link to this page
Your browser does not support the video tag.