My WebLink
|
Help
|
About
|
Sign Out
PC-2010-11, ALAMEDA COUNTY SURPLUS PROPERTY AUTHORITY
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2010-2019
>
2010
>
PC-2010-11, ALAMEDA COUNTY SURPLUS PROPERTY AUTHORITY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2017 4:14:42 PM
Creation date
12/28/2017 4:07:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/26/2010
DESTRUCT DATE
PERMANENT
DOCUMENT NO
PC-2010-11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STONERIDGE DRIVE SPECI.FIC PLAN AMENDMENT/STAPLES RANCH PROJECT <br />MITIGATION MONITORING AND REPORTING PLAN [May 20101 <br />Mitigation Measures/Improvement Measures <br />Monitoring Action <br />Responsibilityi•i''' <br />Timing <br />Date Completed/ <br />Signature <br />seasonal high groundwater mark shall be at least 10 feet. <br />Each individual developer shall be responsible for implementation and <br />maintenance of BMPs. A BMP Monitoring and Maintenance Plan shall <br />be incorporated as part of the WQMP and shall include, at a minimum, <br />annual inspection and maintenance of all structural BMPs on the property, <br />a report of non-structural BMP inspection and compliance, and reporting <br />requirements. The Monitoring and Maintenance Plan must be approved <br />by the City of Pleasanton City Engineer prior to the beginning of <br />occupancy. The Monitoring and Maintenance Plan can be administered <br />through lease agreements assigning responsibility to the occupants, <br />through the creation of a Community Services Authority (CSA) or by <br />other means as approved by the City. If property titles are transferred, the <br />new owner shall .be responsible for their respective portion of the plan. <br />HY-1.2 Implement an Integrated Pest Management Plan and Pesticide <br />Verify that an <br />Verification: City of <br />Verification: Prior <br />Signature <br />Management Program. An Integrated Pest Management Plan shall be <br />integrated Pest <br />Pleasanton <br />to occupancy <br />prepared by each project developer and for the City parks on the Staples <br />Management Plan is <br />prepared and ' <br />Engineering Division. <br />Implementation: <br />permit. <br />Title <br />Ranch site, and implemented to minimize the risk of pollutants associated <br />implemented; field <br />Project Developers <br />Date <br />with landscape establishment and maintenance practices in surface water <br />inspections. <br />and Property Owners. <br />runoff and infiltration to groundwater. All Integrated Pest Management <br />Pian guidelines shall comply with California Department of Pesticide <br />Field inspections: City <br />. Fieldimions: <br />Regulation and Alameda County Agricultural Commissioner rules and <br />of Pleasanton <br />Engineering Division. <br />On-going as <br />as <br />required by Pest <br />regulations in regards to pesticide storage, use, transportation, reporting, <br />Management Plan. <br />and safety. The plan shall encourage minimization and efficiency of <br />chemical and fertilizer use. Because the receiving water have been listed <br />as impaired by diazinon, diazinon use shall also be severely limited or <br />prohibited. <br />Each property owner shall be responsible for implementation of the <br />Integrated Pest Management Plan. The plan must be approved by the City <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.