My WebLink
|
Help
|
About
|
Sign Out
PC-2010-11, ALAMEDA COUNTY SURPLUS PROPERTY AUTHORITY
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2010-2019
>
2010
>
PC-2010-11, ALAMEDA COUNTY SURPLUS PROPERTY AUTHORITY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2017 4:14:42 PM
Creation date
12/28/2017 4:07:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/26/2010
DESTRUCT DATE
PERMANENT
DOCUMENT NO
PC-2010-11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENTISTAPLES RANCH PROJECT <br />MITIGATION MONITORING AND REPORTING PLAN [May 2010] <br />Mitigation Measures/Improvement Measures <br />Monitoring Action <br />Responsibility''"'"''' <br />Timing <br />Date Completed/ <br />Signature <br />Engineer prior to the beginning of occupancy. <br />HY-3.1 Maintain the detention basin. The City shall be responsible for <br />Assure the operation <br />Monitoring: City of <br />On-going. <br />Signature <br />assuring the operation and maintenance of the on-site detention basin and <br />performance goals. Performance goals will include regular system <br />inspections, maintenance when necessary, technical training of staff, and <br />and maintenance of the <br />onsite detention basin <br />and performance goals. <br />Pleasanton <br />Engineering Division. <br />Implementation:. City <br />Title <br />Date <br />funding mechanisms to support continued effective operation and <br />of Pleasanton. <br />maintenance of the detention basin. <br />HY-4.1 Obtain FEMA flood hazard areas updates prior to constniction. <br />Prior to beginning any construction activities, a Conditional Letter of Map <br />Revision shall be obtained from FEMA for the Livermore Flood <br />Verify that a <br />Conditional Letter of <br />Map Revision is <br />obtained from FEMA. <br />Verification: City of <br />Pleasanton <br />Engineering Division. <br />Prior to <br />construction <br />activities. <br />Signature <br />Title <br />Protection Improvements. This letter would not revise an effective <br />Implementation: <br />Date <br />National Flood Insurance Program map; but it would indicate whether the <br />Project Sponsor. <br />project, if built as proposed, would or would not be removed from the <br />Special Flood Hazard Area defined by FEMA if it is later submitted as a <br />request for a Letter of Map Revision. Livermore Flood Protection <br />Improvements shall incorporate FEMA recommended design changes <br />issued with the Conditional Letter of Map Revision. <br />HY-4.2 Implement Livermore Flood Protection Improvements. Prior to <br />issuing the certificate(s) of occupancy, the Livermore Flood Protection <br />Improvements shall be implemented as part of the EL Charro Specific <br />Verify that Livermore <br />flood protection <br />improvements are <br />an <br />Verification: City of <br />Pleasanton <br />Engineering Division. <br />Prior to issuing <br />the certificate(s) <br />of occupancy.completed; <br />Signature <br />Title <br />Plan. This program would include construction of regional stormwater <br />application for a Letter <br />Implementation: City <br />Date <br />detention/retention facilities east of El Charro Road as specified in the <br />of Map Revision to <br />of Livermore or <br />El Charro Specific Plan and construction of the north overbank channel to <br />redirect spills from the Arroyo las Positas that spill over El Charro Road <br />onto the northern portion of the Staples Ranch development site during a <br />reflect both the new <br />facility and <br />improvements to the <br />Arroyo Mocho is <br />Project Sponsor. <br />flood event. The Livermore Flood Protection Improvements shall be <br />submitted to FEMA. <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.