Laserfiche WebLink
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENUSTAPLES RANCH PROJECT <br />MITIGATION MONITORING AND REPORTING PLAN [May 20101 <br />Date Completed/ <br />Mitigation Measures/Improvement Measures <br />Monitoring Action <br />Responsibility <br />Timing <br />Signature <br />the location of the natural gas pipeline using highly visible <br />markers that will remain in place throughout project <br />construction in the vicinity of the pipeline and ensure that all <br />construction workers are aware of the location of the line. <br />The location of the pipeline shall be noted on the site and <br />construction plans. Further, the project contractor shall take <br />all appropriate measures necessary to ensure that the line is <br />not disturbed. <br />c. The project developers shall develop an emergency response <br />plan prior to construction that will include response <br />measures in the event that there is disturbance of any <br />underground utilities. The plan will be subject to review and <br />approval by the City. <br />Hydrology and Water Quality <br />HY-l. I Implement Water Quality Management Plan with Targeted <br />Verify that a site- <br />Verification: City of <br />Prior to <br />Signature <br />Pollutant Removal Rates. In accordance with the applicable provisions of <br />specific Water Quality <br />Pleasanton <br />construction <br />Management Plan is <br />Engineering Division. <br />activities. <br />the Municipal Regional Permit (MRP)- NPDES Permit, implementation <br />prepared and <br />Title <br />of and compliance with the stormwater quality BMPs are required. <br />implemented; field <br />Implementation: <br />Monitoring: <br />Date <br />However, to ensure that implemented BMPs are effective for reducing <br />inspections. <br />Project Developers. <br />On-going. <br />potential pollutant loads to a sufficient level of protection, each project <br />developer shall prepare and implement a site-specific Water Quality <br />Field inspections: <br />Engineering Division. <br />Management Plan (WQMP) with BMPs targeted to reduce post - <br />construction pollutants listed in Table 3.5-5. <br />This WQMP shall identify specific stormwater BMPs for reducing <br />potential pollutants in stormwater runoff. BMPs shall be selected to target <br />pollutants listed in Table 3.5-5; selection criteria and documentation shall <br />go <br />