Laserfiche WebLink
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENUSTAPLES RANCH PROJECT <br />MITIGATION MONITORING AND REPORTING PLAN [May 2010] <br />Date Completed/ <br />Mitigation Measures/Improvement Measures <br />Monitoring Action <br />Responsibility""' <br />Timing <br />Signature <br />Hazards and Hazardous Materials <br />HZ -2.1 Prevent disruption of on-site utilities. The project developer(s) <br />Verify that the <br />Verification: City of <br />Prior to <br />Signature <br />shall implement the following measures: <br />Underground Service <br />Pleasanton Building <br />construction <br />Alert is contacted; <br />and Safety Division. <br />activities. <br />Title <br />a. Prior to initiation of any on-site construction activities, the <br />PG&E gas lines are <br />project developer shall contact the Underground Service <br />identified and <br />demarcated; an <br />Implementation: <br />Project Developers. <br />Date <br />Alert (USA) whose purpose is to receive planned excavation <br />emergency response <br />reports from public and private excavators and to transmit <br />plan for disturbance of <br />Field inspections: City <br />those planned excavation reports to all participating <br />underground utilities is <br />of Pleasanton Building <br />members of USA who may have underground facilities at <br />prepared; field <br />and Safety Division. <br />the location of excavation. The USA will contact local <br />inspections. <br />utilities and inform them that construction is about to begin <br />in their service area. This notice allows local utilities to mark <br />the areas where their underground facilities are located near <br />the construction site so that they may be avoided during <br />project construction. <br />b. Prior to construction activities within 50 feet of the PG&E <br />gas line, the project contractor shall identify and demarcate <br />19 <br />