Laserfiche WebLink
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENUSTAPLES RANCH PROJECT <br />MITIGATION MONITORING AND REPORTING PLAN [May 20101 <br />Mitigation Measures/Improvement Measures <br />Monitoring Action <br />Responsibility'''"'''" <br />Timing <br />Date Completed/ <br />Signature <br />earthmoving activity. The survey shall be conducted by a qualified <br />of survey by biologist; <br />site and related <br />beginning of tree <br />Date <br />biologist, as determined by the City, and -occur no more than 21 days prior, <br />field inspections. <br />construction activities <br />removal or mass <br />to disturbance. If no active nests are found, no further action is required. <br />to be constructed by it <br />grading, includingper <br />PUD conditions of <br />grading for major <br />approval, the <br />infrastructure <br />If active nests for special -status avian species or raptor nests are found <br />Stoneridge Drive <br />improvements. <br />within the construction footprint, construction activities shall be delayed <br />Specific Plan <br />within a minimum 500 -foot buffer zone surrounding active raptor nests <br />Amendment, and/or <br />and a minimum 250-f6ot buffer zone surrounding nests of other special- <br />the DevelopmentAgreement; Project <br />status avian species until the young have fledged. This buffer zone shall <br />Sponsor for the bridge <br />not extend beyond the Staples Ranch site. The appropriate buffer can be <br />and all construction <br />modified by the City in consultation with qualified biologists and the <br />activities to be <br />CDFG. No action other than avoidance shall be taken without CDFG <br />constructed by it perthe <br />consultation. Completion of the nesting cycle shall be determined by a <br />Stoneridge Drive <br />Specific Plan <br />qualified ornithologist or biologist, as determined by the City. <br />Amendment and the <br />Development <br />The buffer zone shall be delineated by highly visible temporary <br />Agreement. <br />construction fencing, and no intensive disturbance (e.g., heavy equipment <br />Endnotes #5 and #6 <br />operation associated with construction, use of cranes or draglines, new <br />apply. <br />rock crushing activities) or other project -related activities that could cause <br />nest abandonment or forced fledging, shall be initiated within the <br />Review of <br />established buffer zone of an active nest. <br />qualifications ofbiologist: <br />City of Pleasanton <br />Community <br />Development <br />Department. <br />Review of report of <br />survey by biologist: <br />City of Pleasanton <br />Community <br />Development <br />Department. <br />13 <br />