My WebLink
|
Help
|
About
|
Sign Out
PC-2010-11, ALAMEDA COUNTY SURPLUS PROPERTY AUTHORITY
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2010-2019
>
2010
>
PC-2010-11, ALAMEDA COUNTY SURPLUS PROPERTY AUTHORITY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2017 4:14:42 PM
Creation date
12/28/2017 4:07:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/26/2010
DESTRUCT DATE
PERMANENT
DOCUMENT NO
PC-2010-11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENUSTAPLES RANCH PROJECT <br />MITIGATION MONITORING AND REPORTING PLAN [May 2010] <br />Date Completed/ <br />Mitigation Measures/Improvement Measures <br />Monitoring Action <br />Responsibilityi "°"'" <br />Timing <br />Signature <br />Immediately. <br />Review of <br />Review of <br />qualifications of <br />qualifications of <br />biologist and review <br />biologist and <br />of survey: <br />survey: Prior to <br />City of Pleasanton <br />construction. <br />Engineering Division. <br />Field inspections if <br />Field inspections: <br />western pond turtle <br />On-going during <br />found: City of <br />construction. <br />Pleasanton <br />Engineering Division. <br />BIO -4.2 Provide Exclusion Fencing for Western Pond Turtle. If western <br />Verify that if western <br />Verification: <br />Prior to <br />Signature <br />pond turtles are determined to be present in the Arroyo Mocho, exclusion <br />pond turtles are present <br />City of Pleasanton <br />construction <br />fencing shall be erected around active construction zones near the Arroyo <br />exclusion fencing is <br />field <br />Engineering Division. <br />activities iferected; <br />western pond <br />Title <br />Mocho to prevent turtles from entering the site. <br />inspections. <br />Implementation: <br />turtles are present. <br />Date <br />Project Sponsor; for <br />potential <br />pedestrian/bike bridge, <br />City of Pleasanton. <br />Endnotes #5 and #6 <br />apply. <br />Field inspections: <br />City of Pleasanton <br />Engineering Division. <br />.BIO -S.1 Conduct nesting bird surveys. Prior to the beginning of tree <br />If nesting bird'survey <br />Contracting of <br />For activities <br />Signature <br />removal or, mass grading, between February 15 and August 15, including ' <br />required, review <br />qualified biologist: <br />-between February <br />grading for major infrastructure improvements, an avian nesting survey <br />qualifications of <br />biologist; review report <br />Each Project <br />Developer for its PUD <br />15 and August 15: <br />prior to the <br />Title <br />shall be conducted of all habitat within 350 feet of any grading or <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.