Laserfiche WebLink
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENT/STAPLES RANCH PROJECT <br />MITIGATION MONITORING AND REPORTING PLAN [May 20101 <br />Date Completed/ <br />Mitigation Measures/Improvement Measures <br />Monitoring Action <br />Responsibility1,11,111,w <br />Timing <br />Signature <br />Field inspections: <br />City of Pleasanton <br />Building and Safety <br />Division or <br />Engineering Division. <br />BIO-6.1 Obtain Streambed Alteration Agreement. The Project Sponsor or <br />Verify that a Section <br />Verification: City of <br />Prior to any <br />Signature <br />project developer shall obtain a Section 1600 Streambed Alteration <br />1600 Streambed <br />Pleasanton <br />construction <br />Agreement from the CDFG prior to any construction activities that may <br />Alteration Agreement <br />was obtained from the <br />Community <br />Development <br />activities that may <br />result in any <br />Title <br />result in any disturbance to stream corridors, including riparian <br />CDFG. <br />Department. <br />disturbance to <br />Date <br />vegetation. Specific mitigation measures shall be developed during <br />Implementation: <br />stream corridors, <br />consultation with the CDFG, but may include measures such as diverting <br />Project Sponsor; for <br />including riparian <br />stream flow around the construction site, using bridges instead of culverts, <br />potential <br />pedestrian/bike bridge,City <br />vegetation. <br />erosion control and bank stabilization measures, and restoring stream <br />of Pleasanton. <br />corridor habitat damaged from project construction. <br />Endnotes #5 and #6 <br />apply. <br />BIO-6.2 Erect exclusion fencing around spearscale mitigation area. Prior <br />Verify that exclusion <br />Verification: <br />Prior to <br />Signature <br />to construction along the banks of the Arroyo Mocho, the project <br />fencing is erected <br />City of Pleasanton <br />construction along <br />around spearscale <br />Engineering Division. <br />the banks of the <br />developer shall ensure that construction crews erect an exclusion fence <br />mitigation area; field <br />Arroyo Mocho. <br />Title <br />around the spearscale mitigation area on the north bank of the arroyo to <br />inspections. <br />Implementation: <br />Date <br />reduce the potential of impacts to the species. The fence shall be orange <br />Project Sponsor; for <br />plastic construction fencing, four feet in height, placed around the plant <br />potential <br />areas that are going to be protected during construction of the bridge. <br />pedestrianfbike bridge,City of Pleasanton. <br />Endnotes #5 and #6 <br />apply. <br />Field inspections: <br />City of Pleasanton <br />Engineering Division. <br />14 <br />