Laserfiche WebLink
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENUSTAPLES RANCH PROJECT <br />MITIGATION MONITORING AND REPORTING PLAN [May 20101 <br />Date Completed/ <br />Mitigation Measures/Improvement Measures <br />Monitoring Action <br />Responsibility" v <br />Timing <br />Signature <br />Ranch Site or the Stoneridge Drive Bridge, the Alameda County Surplus <br />preservation of other <br />easement: Prior to <br />Title <br />Property Authority (ACSPA) shall permanently preserve a minimum of <br />habitat through a <br />issuance of first <br />Date <br />1.77 acres of San Joaquin spearscale habitat in Alameda County by either <br />conservation <br />grading permit. <br />easement: <br />purchasing 1.77 acres worth of credits from the Springtown Natural <br />ACSPA <br />Field inspections: <br />Community Preserve in the City of Livermore or by permanently <br />Prior to <br />protecting 1.77 acres of other spearscale habitat in Alameda County <br />Review of credits or <br />commencement of <br />through the use of a conservation easement or other similar method. <br />conservation <br />grading.easements: <br />City of Pleasanton <br />Engineering Division. <br />BIO -4.1 Conduct Preconstruction Surveys for Western Pond Turtle. A <br />Verify that a <br />Contracting of <br />Survey <br />Signature <br />preconstruction survey for western pond turtle shall be conducted by a <br />preconstruction survey <br />qualified biologist for <br />construction area: <br />qualified biologist three days prior to the onset of bridge construction or <br />for western pond turtle <br />was conducted; removal <br />survey; notification to <br />City of Pleasanton <br />Within 3 days <br />prior to bridge <br />Title <br />activities in the arroyo. The survey area shall be within the arroyo <br />of western pond turtle <br />Engineering Division <br />construction or <br />Date <br />channel and shall encompass all areas within at least 100 feet of the <br />by a qualified biologist <br />if western pond turtle <br />activities within <br />proposed area to be affected. If any western pond turtles are encountered <br />if western pond turtle <br />found; contracting of <br />the Arroyo Mocho <br />during any project activities, construction shall cease until the turtle leaves <br />found; field inspections. <br />qualified biologist for <br />channel, or its <br />removal of western <br />riparian <br />the area or is removed by a qualified biologist and relocated to nearby <br />pond turtle if western <br />vegetation. <br />suitable aquatic habitats. If no western pond turtles are found, then no <br />pond turtle found; <br />further mitigation would be necessary. <br />ceasing construction if <br />Notification to <br />western pond turtle <br />City of Pleasanton <br />found during <br />Engineering <br />construction: <br />Division if <br />Project Sponsor; for <br />western pond <br />potential <br />turtle found during <br />pedestrian/bike bridge, <br />construction: <br />City of Pleasanton. <br />Immediately. <br />Endnotes #5 and #6 <br />Ceasing <br />apply. <br />construction if <br />western pond <br />turtle found during <br />construction: <br />11 <br />