Laserfiche WebLink
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENUSTAPLES RANCH PROJECT <br />MITIGATION MONITORING AND REPORTING PLAN [May 20101 <br />Date Completed/ <br />Mitigation Measures/Improvement Measures <br />Monitoring Action <br />Responsibility'' <br />Timing <br />Signature <br />the Project Sponsor to conduct pre-construction clearance surveys in the <br />notification of US Fish <br />Engineering Division <br />construction or <br />Date <br />construction area for the CRLF no more than 48 hours before construction <br />and Wildlife Service <br />if CRLF found; <br />activities within <br />activities begin. If no CRLF are determined to be in the impact area, then <br />(USFWS) if CRLF <br />contracting of <br />the Arroyo Mocho <br />found; removal of <br />qualified biologist for <br />channel, or its <br />no further mitigation would be necessary. If CRLF are encountered <br />CRLF by a qualified <br />removal of CRLF if <br />riparian <br />during any construction activities within suitable habitat, construction <br />biologist if CRLF <br />CRLF found; ceasing <br />vegetation. <br />shall cease and the USFWS shall be notified immediately. Before <br />found; field inspections. <br />construction if CRLF <br />construction activities can restart, the CRLF shall be removed by a <br />found during <br />Notification to <br />USFWS/CDFG-approved biologist and relocated to nearby suitable <br />construction: <br />USFWS and City <br />Project Sponsor; for <br />of Pleasanton <br />aquatic habitat. <br />potential <br />Engineering <br />pedestrian/bike bridge, <br />Division if CRLF <br />City of Pleasanton. <br />found during <br />construction: <br />Immediately. <br />Endnotes #5 and #6 <br />apply." <br />Ceasing <br />construction if <br />CRLF found <br />during <br />construction: <br />Immediately. <br />Review of <br />Review of <br />qualifications of <br />qualifications of <br />biologist and review <br />biologist and <br />of survey: <br />survey: Prior to <br />City of Pleasanton <br />construction. <br />Engineering Division. <br />Field inspections if <br />Field inspections: <br />CRLF found: City of <br />On-going during <br />Pleasanton <br />construction. <br />Engineering Division. <br />BIO-2.2 Implement ground disturbance restrictions associated with <br />Verify implementation <br />Implementation; <br />On-going during <br />Signature <br />construction near the Arroyo Mocho. To minimize disturbance to <br />of ground disturbance <br />Project Sponsor for <br />construction. <br />