My WebLink
|
Help
|
About
|
Sign Out
PC-2010-11, ALAMEDA COUNTY SURPLUS PROPERTY AUTHORITY
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2010-2019
>
2010
>
PC-2010-11, ALAMEDA COUNTY SURPLUS PROPERTY AUTHORITY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2017 4:14:42 PM
Creation date
12/28/2017 4:07:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/26/2010
DESTRUCT DATE
PERMANENT
DOCUMENT NO
PC-2010-11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STONERIDGE DRIVE SPECIFIC PLAN AMENDMENUSTAPLES RANCH PROJECT <br />MITIGATION MONITORING AND REPORTING PLAN [May 2010] <br />Date Completed/ <br />Mitigation Measures/Improvement Measures <br />Monitoring Action <br />Responsibility"'Il <br />Timing <br />Signature <br />dispersing or foraging CRLF, all construction activities within 100 feet of <br />restrictions during <br />the bridge and all <br />Title <br />Arroyo Mocho aquatic habitats, including construction of the Stoneridge <br />construction; field <br />construction activities <br />Drive bridge, shall be conducted during the dry season, between May 1 <br />inspections. <br />to be constructed by it <br />per the •Stoneridge <br />Date <br />and October 15, or before the onset of the rainy season, whichever occurs <br />Drive.Specific Plan <br />first unless exclusion fencing is utilized. Construction that commences in <br />Amendment and the <br />the dry season may continue into the rainy season if exclusion fencing is <br />Development <br />placed between the construction site and Arroyo Mocho to keep the frog <br />Agreement. <br />from entering the construction area. <br />Endnotes #5 and #6 <br />apply. <br />Field inspections: <br />City of Pleasanton <br />Engineering Division. <br />BIO -2.3 Conduct construction monitoring for CRLF. If preconstruction <br />If monitoring is <br />Contracting of <br />Contracting of <br />Signature <br />surveys identify CRLF in the Arroyo Mocho channel within the Project <br />required, verify <br />qualified biologist for <br />qualified biologist <br />Area, the Project Sponsor shall retain a qualified biologist to monitor for <br />monitoring for the <br />presence of CRLF <br />monitoring; ceasing <br />construction and <br />for monitoring and <br />reviewing <br />Title <br />the presence of CRLF in the active construction area within Arroyo <br />during construction; <br />notifying USFWS and <br />biologist's <br />Date <br />Mocho channel. If individual CRLF could be directly affected by project <br />cease construction and <br />City of Pleasanton <br />qualifications: <br />construction, then these activities shall cease and the USFWS shall be <br />notify USFWS if <br />Engineering Division <br />Prior to <br />notified immediately. Formal consultation may then be required by the <br />monitor finds that <br />if CRLF monitor finds <br />construction <br />CRLF could be directly <br />that CRLF could be <br />activities. <br />USFWS, and mitigation measures will be developed through the <br />affected by project <br />directly affected by <br />consultation process to reduce impacts to the species. The Project Sponsor <br />construction; <br />project construction; <br />Ceasing <br />shall implement mitigation measures that are recommended by the <br />notification of and <br />consultation with <br />construction and <br />USFWS through the consultation process to reduce impacts to this <br />consultation with <br />USFWS, if required <br />notify USFWS <br />USFWS, if required by <br />by USFWS, if CALF <br />and City of <br />species. <br />USFWS, if CRLF <br />monitor finds that <br />Pleasanton <br />monitor finds that <br />CRLF could be <br />Engineering <br />CRLF could be directly <br />directly affected by <br />Division if CRLF <br />affected by project <br />project construction; <br />monitor finds that <br />construction; <br />implement mitigation <br />CRLF could be <br />implementation of <br />measures <br />directly affected <br />mitigation measures <br />recommended by <br />by project <br />
The URL can be used to link to this page
Your browser does not support the video tag.