Laserfiche WebLink
All buildings shall be set back a minimum of 20 feet from the top of <br />the arroyo bank, in case there is a seismically induced bank failure, <br />per MM TR -2.1.. <br />DEIR, p. 4-35 <br />Utilities <br />Findings Regarding Impacts <br />3. Increased demand for water. <br />Finding. The City finds that the following mitigation measure is feasible and <br />has been incorporated into the MMRP, thereby mitigating the <br />impact to a less -than- significant level: <br />Irrigation plans shall incorporate low -flow irrigation head and/or drip <br />irrigation with electric controllers set to water after 7:00 p.m. and <br />before 10:00 a.m., and proper soil preparation for landscaped areas <br />that includes a minimum of .two inches of mulch and two inches of <br />organic soil amendment, as recommended by a qualified landscape <br />architect, per MM UT -1. <br />DEIR, p. 4-38 <br />Cumulative Impacts <br />Findings Regarding Significant Impacts <br />Cumulative Aesthetics and Visual Quality impacts with the preferred project and <br />other foreseeable development. <br />Finding. The City finds that there are no measures available to mitigate this <br />impact. A statement of overriding considerations for this impact is <br />made in the following section. <br />DEIR, p. 4-6 <br />2. Cumulative Air Quality impacts with the preferred project and other foreseeable <br />development. <br />Finding. The City finds that implementation of the project level mitigation <br />would reduce cumulative impacts; however, this would not reduce <br />cumulative 'impacts 'to less than significant. A statement of <br />overriding considerations for this impact is made in the following <br />section. <br />DEIR, p. 4-7 <br />33 <br />Findings and Statement of Overriding Considerations <br />