Laserfiche WebLink
Require project developers to implement construction best <br />management practices to reduce construction noise, per MM <br />NO -3.1. <br />Draft SEIR, pp. 70-73; DEIR, p. 3.7-29 <br />21. Potential for significant increase in noise levels along Stoneridge Drive <br />Finding. The preferred project would result in significant noise impacts. The <br />City finds that the following mitigation measures are feasible and <br />have been incorporated into the MMRP; however, even with <br />implementation, the impact would remain significant and <br />unavoidable. A statement of overriding considerations for this <br />impact is made in the following section. <br />Repave Stoneridge Drive between Kamp Drive and Trevor Parkway <br />with noise -attenuating pavement and replace the sound wall <br />nearest the Stoneridge Drive bridge, per MM S -NO -1.1. Pave new <br />portions of Stoneridge Drive with noise -attenuating pavement per <br />MM NO -4.1. <br />The Project Sponsor will be responsible for the funding of the <br />paving of the new portions of Stoneridge Drive and the construction <br />of the sound wall. The Project Sponsor will also be responsible for <br />the funding of repaving of Stoneridge Drive from Kamp Drive to <br />Trevor Parkway to the maximum amount set forth in the Specific <br />Plan Amendment ($1.5 million for all off site traffic improvements). <br />Costs in excess of that amount will come from City funds; either the <br />Stoneridge Drive Specific Plan fees or the traffic fees generated by <br />the project to meet these costs. <br />Draft SEIR, pp. 70-76 <br />Transportation and Traffic <br />Findings Regarding Significant Impacts <br />22. Increased traffic and unacceptable levels of service at four Pleasanton <br />intersections <br />Finding. The City finds that the following mitigation measures identified for <br />these four intersections are feasible and have been incorporated <br />into the MMRP, thereby mitigating the impacts to a less -than - <br />significant level: <br />Improve Hopyard Road at Owens Drive (#10), per MM <br />TR -1.2. <br />28 <br />Findings and Statement of Overriding Considerations <br />