My WebLink
|
Help
|
About
|
Sign Out
PC-2010-11, ALAMEDA COUNTY SURPLUS PROPERTY AUTHORITY
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2010-2019
>
2010
>
PC-2010-11, ALAMEDA COUNTY SURPLUS PROPERTY AUTHORITY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2017 4:14:42 PM
Creation date
12/28/2017 4:07:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/26/2010
DESTRUCT DATE
PERMANENT
DOCUMENT NO
PC-2010-11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
[The improvements are included as projects in the City's Traffic <br />Development Fee. The project developers and, to the extent so <br />provided in the development agreement, the City of Pleasanton, <br />shall pay traffic development fees to address this mitigation.] <br />Improve Hopyard Road at Stoneridge Drive (#11), per MM <br />TR -1.3. <br />[The proposed mitigations are a new turn lane and signal retiming. <br />The improvements are included as projects in the City's Traffic <br />Development Fee. The Project Developers and, to the extent so <br />provided in the Development Agreement, the City of Pleasanton <br />shall pay traffic development fees. The City of Pleasanton shall be <br />responsible for signal retiming.] (Note that this mitigation is not <br />needed during the time Stoneridge Drive is striped for one travel <br />lane in each direction but is needed when Stoneridge Drive is <br />striped for two travel lanes in each direction.) <br />Improve Santa Rita Road at Stoneridge Drive (#32), per MM <br />S -TR -2.1 and TR -1.3(a) <br />[The proposed mitigation includes restriping and the creation of <br />new turn lanes. The Project Sponsor will fund this improvement to <br />the maximum amount provided in the Specific Plan Amendment <br />($1.5 million for all off site traffic improvements). Costs in excess <br />of that amount will come from City funds; either the Stoneridge <br />Drive Specific Plan fees or the traffic fees generated by the project <br />to meet these costs.] <br />Improve Santa Rita Road at Valley Avenue (04), per MM <br />TR -1.4. <br />[The proposed mitigation is to construct a second westbound left <br />turn and either widen a northbound right -turn lane or construct a <br />third southbound left turn. These improvements are included as <br />projects in the City's Traffic Development Fee. The project <br />developers and, to the extent so provided in the development <br />agreement, the City of Pleasanton shall pay traffic development <br />fees to address this mitigation. The proposed mitigation is also <br />signal retiming. The City of Pleasanton shall be responsible for the <br />signal retiming.] <br />Draft SEIR, pp. 76-80; DEIR, pp. 3.9-35 3.9-36, FOR 3-20,3-22 <br />23. Increased traffic and unacceptable levels of service at two intersections (Fallon <br />Road at Dublin Boulevard [in Dublin] and Murrieta Blvd. and East Jack London <br />Blvd. [in Livermore]) not within Pleasanton <br />29 <br />Findings and Statement of Overriding Considerations <br />
The URL can be used to link to this page
Your browser does not support the video tag.