Laserfiche WebLink
c. Windows shall be recessed per Terry Townsend's letter, dated "Received <br />December 4, 2009". The construction drawings shall include window details <br />showing the required recess. Additionally, the proposed sliding windows shall <br />be revised to a pair of vertical sliders, either double -hung or single -hung, with <br />a four -inch solid stucco frame between the pair. <br />d. Additional stone element shall be shown on the south elevation. Specifically, <br />the south (right) facing elevation shall have a stone wrapped wainscot to <br />break the length fagade, as per Terry Townsend's letter. <br />e. Additional stone element shall be added to the front of the garage, returning <br />around the corner to the entry. It shall"also wrap around the opposite building <br />corner to and including the wall between the two garage overhead doors. <br />f. Clay barrel tile is the only material for the roof. <br />g. The elevation drawings shall denote smooth textured stucco on the building <br />exteriors. Prior to the issuance of a building permit, the project developer <br />shall provide a stucco sample to the Director of Community Development for <br />approval. <br />h. A pair of vertical sliding window (double -hung or single -hung) shall be added <br />on the center of the sidewall of the garage as per Terry Townsend's letter. <br />i. An arbor element shall be added above the garage doors. Details of this <br />arbor shall be submitted to the Director of Community Development for review <br />and approval prior to the issuance of a building permit. <br />15.The applicant shall add further detailing to the house to meet the requirement for <br />consistent detailing on all sides of the home and shall examine the house massing <br />relative to the design guidelines. The architectural details are subject to the review <br />and approval by the Director of Community Development and the Planning <br />Commission subcommittee represented by Commissioners Narum and O'Connor. <br />Green Building: <br />16. The project development shall engage a third -party consultant to manage <br />compliance to the Green Building Ordinance. Prior to the building final, the <br />third -party consultant shall certify in writing that the project has met the Green <br />Building requirements. <br />If a third party consultant is not retained, prior to building permit submittal, a list of <br />the green building measures used in the design of the units, covered by this <br />approval, shall be provided to the Planning Division for the review and approval by <br />the Director of Community Development. The homes covered by this approval shall <br />3 <br />