Laserfiche WebLink
11. Emergency Services. The following items will be provided prior to any <br />construction above the foundation or slab, unless otherwise determined by the <br />Fire Marshal. NOTE: Periodic inspections will be made for compliance. <br />a. Where multiple buildings are under construction, access shall be provided <br />around all buildings as specified on the Site Plan Approval or Exhibit B. <br />b. Where on site fire hydrant(s) are required, they shall be installed, flushed and <br />all valves open prior to any construction above the foundation or slab. This <br />includes concrete -tilt -up and masonry buildings. Temporary aboveground <br />water storage tanks are not permitted as alternative water supply sources for <br />commercial and industrial development. <br />c. Prior to request for final inspection, all access roads, on site access and fire <br />hydrants shall be provided. All fire hydrants shall be acceptance inspected <br />and tested to applicable City Public Works Standards. <br />d. Where a project is phased as part of the development approved by the City, <br />specific access, water supply and fire hydrant installations will be required as <br />part of each phase. As needed a phasing plan with these improvements will <br />be required. <br />Where on site grading/utility plans are submitted for review and approval prior <br />to building construction drawings, emergency vehicle access routes, fire <br />hydrant locations, material staging areas, etc. shall be provided. <br />12. Site Development Standards. <br />a. All future additions, site design changes, and new structures shall be <br />reviewed on a case-by-case basis in accordance with the purposes and <br />requirements of Chapter 18.68 of the Pleasanton Municipal Code. All future <br />site design changes, landscaping changes, building additions, and new <br />buildings shall be subject to a PUD Modification process, except as otherwise <br />conditioned. <br />X <br />