Laserfiche WebLink
shall mark all trash disposal bins "trash materials only" and all recycling bins <br />"recycling materials only". The applicant shall contact Pleasanton Garbage <br />Service for the disposal of all waste from the site. <br />5. All demolition and construction activities, inspections, plan checking, material <br />delivery, staff assignment or coordination, etc., shall be limited to the hours of <br />8:00 a.m. to 5:00 p.m., Monday through Friday. No construction shall be allowed <br />on State or Federal Holidays or Sundays. All construction equipment must meet <br />Department of Motor Vehicles (DMV) noise standards and shall be equipped with <br />muffling devices. Prior to the start of construction, the applicant shall post on the <br />site the allowable hours of construction activity. <br />6. A Construction Best Management Plan shall be prepared for this development <br />and shall include, but is not limited, to the following: <br />a. No individual piece of construction equipment shall produce a noise level <br />exceeding 83 dBA at a 25 -foot distance. <br />b. All internal combustion -engine driven equipment shall be equipped with <br />exhaust mufflers maintained in good condition and appropriate for the <br />equipment. <br />c. Stationary noise generating equipment shall be located as far as possible <br />from sensitive receptors adjoining or located near the construction area. <br />d. Air compressors and other stationery noise sources shall be as quiet as the <br />technology allows. <br />e. Except for security trailers staffed by licensed security personnel, at no time <br />shall campers, trailers, motor homes, or any other vehicle be used as living or <br />sleeping quarters on the construction site. All such vehicles shall be removed <br />from the site at the end of each workday. A construction trailer shall be <br />allowed to be placed on the project site for daily administration/coordination <br />purposes during the construction period. <br />f. Portable toilets used during construction shall be kept as far as possible from <br />the existing apartment buildings and shall be emptied on a regular basis as <br />necessary to prevent odor. <br />Green Building Measures <br />7. The applicant shall implement the GreenPoint Checklist and the staff analysis of <br />the checklist — Exhibit D.1 and Exhibit D.2, respectively —with the design and <br />construction of the units covered by this approval. The applicant shall submit a <br />list of all green building measures used in the design and construction of the <br />OA <br />