My WebLink
|
Help
|
About
|
Sign Out
PC-2009-08, PDR-804/PCUP-233, TOM KUBO/WILLIAM WOOD ARCHITECTS/HANA JAPAN
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2009
>
PC-2009-08, PDR-804/PCUP-233, TOM KUBO/WILLIAM WOOD ARCHITECTS/HANA JAPAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2017 3:00:10 PM
Creation date
12/28/2017 2:46:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/11/2009
DESTRUCT DATE
PERMANENT
DOCUMENT NO
PC-2009-08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
55. The project developer shall submit a refundable cash bond for hazard and <br />erosion control prior to issuance of an Engineering or Building and Safety <br />Division permit. The amount of this bond will be determined by the City <br />Engineer. <br />56. The haul route for all materials to and from this development shall be approved <br />by the City Engineer prior to the issuance of an encroachment permit. <br />57. The project developer shall submit a dust control plan or procedure as part of the <br />building permit plans. <br />58. Storm drainage swales shall be privately maintained by the property owner. <br />59. The design of the water supply systems shall be subject to the review and <br />approval of the City Engineer. <br />60. Any damage to existing street improvements during construction on the subject <br />property shall be repaired to the satisfaction of the City Engineer at full expense <br />to the project developer. This shall include slurry seal, overlay, or street <br />reconstruction if deemed warranted by the City Engineer. <br />61. The project developer's contractor(s) shall obtain an encroachment permit from <br />the City Engineer prior to moving any construction equipment onto the site. <br />Urban Stormwater Runoff Requirements <br />Stormwater Design Requirements <br />62. In addition to comply with the Alameda Countywide Standard Urban Stormwater <br />Runoff Requirements NPDES Permit # CA5002983, the applicant shall comply <br />with the Permit's Hydromodification requirements unless otherwise approved by <br />the City Engineer. <br />63. The following requirements shall be incorporated into the project: <br />a) The project developer shall submit a final grading and drainage plan prepared <br />by a licensed civil engineer depicting all final grades and on-site drainage <br />control measures. This plan shall be subject to the review and approval of the <br />City Engineer prior to the issuance of any building permits. <br />b) The project developer shall submit sizing design criteria to treat stormwater <br />runoff at the time of plan submittal. <br />c) Landscaping shall be designed to minimize irrigation and runoff, promote <br />surface infiltration where appropriate, and minimize the use of fertilizers and <br />pesticides that can contribute to stormwater pollution. <br />Q <br />
The URL can be used to link to this page
Your browser does not support the video tag.