Laserfiche WebLink
1) Structures shall be designed to discourage the occurrence and entry of <br />pests into buildings, thus minimizing the need for pesticides. <br />2) Where feasible, landscaping shall be designed and operated to treat <br />stormwater runoff. In areas that provide detention of water, plants that are <br />tolerant of saturated soil conditions and prolonged exposure to water shall <br />be specified. Soil shall be amended as required. <br />3) Plant materials selected shall be appropriate to site specific characteristics <br />such as soil type, topography, climate, amount and timing of sunlight, <br />prevailing winds, rainfall, air movement, patterns of land use, ecological <br />consistency and plant interactions to ensure successful establishment. <br />4) Landscaping shall comply with City of Pleasanton ordinances and policies <br />regarding water conservation. <br />d) Prior to grading permit issuance the project developer shall submit a copy of <br />the State Water Resources Control Board Notice of Intent (NOI) for coverage <br />under the State Construction Storm Water General Permit for projects with <br />clearing, grading and excavation exceeding the current standards. <br />Stormwater Construction Requirements <br />64. The project development shall submit a Stormwater Pollution Prevention Plan <br />(SWPPP) for review and approval by the City Engineer prior to issuance of <br />building or grading permits. Failure to comply with the approved construction <br />SWPPP may result in the issuance of correction notices, citations or stop work <br />order. The following construction Best Management Practices (BMPs), as well <br />as any other applicable measure, shall be included in the SWPPP and <br />implemented as approved by the City. <br />65. The project developer is responsible for implementing the following measures <br />during all construction phases of the project: <br />a) The project developer shall include erosion control/storm water quality <br />measures on the final grading plan which shall specifically address measures <br />to prevent soil, dirt, and debris from entering the storm drain system. Such <br />measures may include, but are not limited to, hydroseeding, hay bales, <br />sandbags, and siltation fences and are subject to the review and approval of <br />the City Engineer/Chief Building Official. If no grading plan is required, <br />necessary erosion control/storm water quality measures shall be shown on <br />the site plan submitted for an on-site permit, subject to the review and <br />approval of the Director of Building Inspection. The project developer is <br />responsible for ensuring that the contractor is aware of and implements such <br />measures. <br />10 <br />