My WebLink
|
Help
|
About
|
Sign Out
PC-2008-10, PUD-81-28-05M, JAMES HAPP/NORTHSTAR REALTY SERVICES, INC.
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2008
>
PC-2008-10, PUD-81-28-05M, JAMES HAPP/NORTHSTAR REALTY SERVICES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2017 2:33:28 PM
Creation date
12/21/2017 4:08:22 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/27/2008
DESTRUCT DATE
PERMANENT
DOCUMENT NO
PC-2008-10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8. This project shall be annexed to Silver Oaks Estates Phase I and shall be a <br />single homeowners association to own and maintain the common areas and <br />facilities covered by PUD -05, Tract 7399, and the tract for this project. <br />9. A final landscape plan enhancing the landscape plan included in the PUD -5 <br />approval shall be submitted to the Planning Division for review and approval, <br />requiring all frontage landscaping along Vineyard Trail, Lots 6-10, and shall be <br />installed with an automatic irrigation system prior to the first lot being sold. <br />10. The rear lot lines for Lots 1-5 shall be adjusted so that a minimum five feet exists <br />between the rear lot line fence and the face of the retaining wall. This area shall <br />be a part of Parcel C and shall contain the drainage swale at the top of the wall <br />and the fire buffer, mowed area described in the Open Space Management Plan <br />and Wildland Protection Plan. <br />11. When retaining walls are offset as shown in Lots 6-9, appropriate retaining walls <br />shall be constructed on the property line to link the walls, as necessary; such <br />walls shall be shown on the final grading plan and shall be reviewed and <br />approved by the Director of Planning and Community Development prior to the <br />approval of the final map. <br />12. The retaining wall at Vineyard Avenue Trail shall be either a decorative wall or <br />shall be set back sufficiently to have shrub landscaping planted between it and <br />the horse path. Final design shall be subject to the review and approval by the <br />Director of Planning and Community Development prior to the approval of the <br />Final Map. <br />13. No retaining walls are required around existing utility poles as shown on the <br />tentative map preliminary grading and utility plan due to the removal of the <br />overhead utility lines along Vineyard Avenue Trail. Alternately, if the overhead <br />lines have not been removed, retaining walls shall remain required. The <br />applicant shall coordinate with the City Engineer. <br />14. Unless otherwise approved by the Fire Marshal, no house construction shall <br />begin until such time as an acceptable emergency vehicles access has been <br />established, as defined by the Fire Marshal. This access shall be maintained at <br />all times until the public improvements are accepted. <br />15. No sports court shall be allowed in this development. This shall be added to the <br />Design Guidelines and CC&Rs. <br />16. Trucks hauling excavated materials shall be covered with tarpaulins or other <br />effective covers, subject to the approval of the Director of Planning and <br />Community Development. In addition to regulating the haul route to and from this <br />project, the City Engineer shall regulate the hours of all truck traffic so as to avoid <br />conflicts with school traffic during peak school drop-off and pick-up hours and <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.