Laserfiche WebLink
<br />Resolution No. PC-99-32 <br />Page 5 <br /> <br />12. Prior to the issuance of a building permit for any building on Lot 53A, the <br />developer shall submit for the review and approval of the City Attorney and City <br />Engineer, a permanent, non-revokable cross-access easement for common use of <br />vehicular access-ways between Lot 53A and Lot 53B A permanent, non-revokable <br />easement for common use of utilities shall be established as needed. <br /> <br />13. Proof ofrecordation of this required easement, or similar, already-recorded <br />easement, is required prior to final occupancy ofthe building. <br /> <br />14. Prior to the issuance of a building permit for any building on Lot 52 and subject to <br />the review and approval of the City Engineer and City Traffic Engineer, the site <br />and grading plans for Lot 52 shall show an approximately eleven feet wide and <br />150 feet long deceleration located to serve the most easterly Owens Drive <br />driveway. This deceleration lane shall be constructed by the developer. A <br />signing and striping plan for this deceleration lane also shall be submitted for the <br />review and approval of the City Traffic Engineers. The developer shall <br />re-construct all necessary street frontage improvements per Chapter 19.40.010 of <br />the Pleasanton Municipal Code, and in accordance with the Hacienda Design <br />Guidelines, and to the satisfaction of the City Engineer. These improvements may <br />include, but are not necessarily limited to, grading, curb and gutter, sidewalk, <br />paving, storm drain, sanitary sewer, water facilities, street lighting, underground <br />utilities, traffic control devices, landscaping, and automatic irrigation systems. <br />The developer/property owner shall dedicate to the City for street right-of-way <br />purposes those parcels ofland for the deceleration lane intended to be part of the <br />public street (Owens Drive) or shall grant an easement to the City over those <br />parcels needed for public service easements (P.S.E.) or public access easement <br />(P.A.E.) for the deceleration lane. <br /> <br />15. Should parking demand on Lot 52 exceed parking supply, the Planning Director <br />may require the installation of 15 additional parking spaces to meet the required <br />ratio of 1 parking space per every 300 square feet of building area. <br /> <br />16. Prior to the issuance ofa building permit for any building on any of the lots, the <br />site plan for that lot shall show clear demarcation and definition of the <br />"preferential" parking spaces, carpool, vanpool, and handicap accessible parking <br />spaces as required by the Hacienda Design Guidelines. <br /> <br />17. The developer is encouraged to work with the City's Civic Arts Commission to <br />locate the volunteered installation of public art in the courtyard area between <br />Buildings B and C on Lot 52. <br />