Laserfiche WebLink
<br />not limited to, hydroseeding, hay bales, sandbags, and siltation fences and are <br />subject to the review and approval of the City Engineer/Director of Building <br />Inspection. Ifno grading plan is required, necessary erosion control/storm water <br />quality measures shall be shown on the site plan submitted for an on-site permit, <br />subject to the review and approval of the Director of Building Inspection. The <br />applicant is responsible for ensuring that the contractor is aware of and implements <br />such measures. <br /> <br />41. All cut and fill slopes shall be revegetated and stabilized after completion of <br />grading, but in no case later than October IS. Hydroseeding shall be accomplished <br />before September 15 and irrigated with a temporary irrigation system to ensure that <br />the grasses are established before October 15. No grading shall occur between <br />October 15 and April 15 unless approved erosion control/storm water quality <br />measures are in place, subject to the approval of the City Engineer/ Director of <br />Building Inspection. Such measures shall be maintained until such time as <br />permanent landscaping is place. <br /> <br />42. The applicant shall submit a construction Best Management Practices (BMP's) <br />program for review and approval by the Planning Director prior to issuance of <br />building and/or grading permits. These BMP's shall be implemented by the general <br />contractor and all subcontractors and suppliers of materials and equipment. <br />Construction site cleanup and control of construction debris shall also be addressed. <br />Failure to comply with the approved construction BMP may result in the issuance of <br />correction notices, citations, or a stop work order. <br /> <br />43. The applicant is responsible for implementing the following measures during all <br />construction phases of the project: <br /> <br />a. Gather all construction debris on a regular basis and place it in a dumpster or <br />other container which is emptied or removed an a weekly basis. When <br />appropriate, use tarps on the ground to collect fallen debris or splatters that <br />could contribute to storm water runoff pollution. <br /> <br />b. Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br />pavement and storm drains adjoining the site. Limit construction access routes <br />onto the site and place gravel on them. Do not drive vehicles and equipment <br />off paved or graveled areas during wet weather. Broom sweep the street <br />pavement adjoining the project site on a daily basis. Scrape caked-on mud and <br />dirt from these areas before sweeping. <br /> <br />PUD-98-1O <br /> <br />Planning Commission <br />