Laserfiche WebLink
<br />c. Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain <br />inlet nearest the downstream side of the project site in order to retain any debris <br />or dirt flowing in the storm drain system. Maintain and/or replace filter <br />materials to ensure effectiveness and to prevent street flooding. <br /> <br />d. Create a contained and covered area on the site for the storage of bags, cement, <br />paints, oils, fertilizers, pesticides, or other materials used on the site that have <br />the potential of being discharged into the storm drain system through being <br />windblown or in the event of a material spill. <br /> <br />e. Never clean machinery, equipment, tools, brushes, or rinse containers into a <br />street, gutter, or storm drain. Ensure that concrete/gunite supply trucks or <br />concrete/plaster operations do not discharge wash water into street, gutters, or <br />storm drains. <br /> <br />44. The applicant shall include restoration of the natural slope on the Nelson property on <br />the landscape plan submitted with the design review application for the house. <br /> <br />PUD-98-10 <br /> <br />Planning Commission <br />