My WebLink
|
Help
|
About
|
Sign Out
ORD 0655
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
0601 - 0700
>
ORD 0655
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2004 10:37:32 AM
Creation date
10/15/1999 11:01:23 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 0655
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
62-18.35 Plans and Specifications. <br /> <br /> (a) The Administrative authority may require the <br /> <br /> submission of plans ~ specifications, drawings, and such other <br /> <br /> information as he may deem necessary, prior to the commencement <br /> <br /> of, and at any time during the progress of any work regulated <br /> <br /> by this chapter. <br /> <br /> (b) All design, construction, and workmanship shall <br /> <br /> be in conformity with accepted engineering practices and shall <br /> <br /> be of such character as to secure the results sought to be <br /> <br /> obtained by this chapter. The administrative authority shall <br /> <br /> require that plans, specifications, and drawings be prepared and <br /> <br /> certified by a registered professional engineer of the appro- <br /> priate discipline~ i.e., for the pool structure, a registered <br /> civil or structural engineer and for the mechanical system, a <br /> registered civil or mechanical engineer. Master plans may be <br /> submitted in fulfillment of this paragraph. <br /> <br /> (c) It shall be the responsibility of the permittee <br /> to obtain and furnish a letter from the responsible registered <br /> engineer certifying that the structural designs are suitable <br /> for the conditions actually encountered on the site. <br /> <br /> (d) When the permittee desires~ he may use the <br /> manufacturer's standard structural and mechanical details for <br /> portable pools erected on the surface of the ground. <br /> <br /> (e) The entire design of matched components shall <br />~have sufficient capacity to provide a complete turnover of <br /> <br /> pool water in twelve (12) hours or less. <br /> <br /> 62-18.36 Permit Required <br /> <br /> No swimming pool installation, alteration, or repair <br /> <br /> work shall be commenced until a permit to do such work first <br /> <br /> shall have been obtained from the administrative authority. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.