My WebLink
|
Help
|
About
|
Sign Out
PC-98-67
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1998
>
PC-98-67
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:03 AM
Creation date
12/17/2003 2:43:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/26/1998
DOCUMENT NO
PC-98-67
DOCUMENT NAME
PUD-81-30-76D,PUD-85-8-11D
NOTES
PEOPLESOFT,INC/HACIENDA MARKETING
NOTES 3
OFFICE BLDG/PARKING GARAGE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Resolution No. PC-98-67 <br /> <br />Page II <br /> <br />b.) Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement, <br />and storm drains adjoining the project site. During wet weather avoid driving vehicles <br />off paved areas. <br /> <br />c.) Broom sweep the public street pavement adjoining the project site on a daily basis. <br />Caked-on mud or dirt shall be scraped from these areas before sweeping. <br /> <br />d.) Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br />nearest the downstream side of the project site in order to retain any debris or dirt flowing <br />into the City storm drain system. Filter materials shall be maintained and!or replaced as <br />necessary to ensure effectiveness and to prevent street flooding. Dispose of filter <br />particles in the trash. <br /> <br />e.) Create a contained and covered area on the site for the storage of bags, cement, paints, <br />flammable, oils, fertilizers, pesticides, or any other materials used on the project site that <br />have the potential for being discharged to the storm drain system through being <br />windblown or in the event of a material spill. <br /> <br />f.) Never clean machinery, tools, brushes, etc., or rinse containers into a street, gutter, or <br />storm drain. <br /> <br />g.) Ensure that concrete/gunite supply trucks or concrete/plasterers operations do not <br />discharge wash water into street gutters or drains. <br /> <br />h.) Construction access routes shall be limited to those approved by the City Engineer or <br />Building Inspector and shall be shown on the approved grading plan. <br /> <br />68. The applicant shall install structural control, such as an oil/water separator, sand filter, or <br />approved equal in the parking lot to intercept and pretreat storm water prior to reaching <br />the storm drain. The design, locations, and a schedule for maintaining the separator shall <br />be submitted to the City Engineer/Director of Building Inspection for review and <br />approval prior to issuance of building permits. The structural control shall be cleaned at <br />least twice a year: once immediately prior to October 1 and once in January. The <br />applicant shall enter into a maintenance agreement for the oil/water separator with the <br />City. <br /> <br />69. The trash enclosure area(s) shall be completely covered. An area drain shall be installed <br />in the enclosure area which connects to the sanitary sewer. No other area shall drain into <br />the trash enclosure; a berm shall be installed to prevent such drainage if found necessary <br />by the City Engineer/Director of Building Inspection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.