Laserfiche WebLink
Site(s) Implementation Monitoring Monitoring and Reporting Monitoring Verification of <br /> Mitigation Measures Affected Procedures Responsibility Action Schedule Compliance <br /> 4.D.Transportation and Traffic <br /> Mitigation Measure 4.D-la:Commerce Drive at Johnson Drive All(Phase I Site developer shall Site developer Develop the funding Prior to granting Verified by: <br /> Intersection.Prior to the granting of a certificate of occupancy for the and Full contribute fair-share Community mechanism,the calculation of, certificate of Date: <br /> first use in Phase I that would generate 100 or more PM or Saturday Buildout) funds for traffic impact Development and receipt of payment. occupancy. <br /> peak-hour trips,the City shall install or require the developer in Phase I fees or construct the Department <br /> to install a traffic signal and construct a southbound left-turn lane to <br /> Commerce Drive at the Commerce Drive and Johnson Drive improvement. <br /> intersection.A funding mechanism for this improvement shall be Community Development <br /> approved by the City prior to the issuance of the first building permit for Department shall ensure <br /> a Phase I use that would generate 100 or more PM peak-hour trips. the implementation of <br /> improvements and <br /> determine funding <br /> mechanism. <br /> Mitigation Measure 4.D-1 b:Johnson Drive at Owens Drive(North) All(Phase I The site developer shall Site developer Develop the funding Prior to granting Verified by: <br /> Intersection.Prior to the granting of a certificate of occupancy for the and Full contribute fair-sharemechanism,the calculation of, certificate of <br /> Community Date: <br /> first use in Phase I that would generate 100 or more PM or Saturday Buildout) funds for traffic impact Development and receipt of payment. occupancy. <br /> peak-hour trips,the City shall install or require the developer in Phase I fees or construct the Department <br /> to install a traffic signal at the Johnson Drive at Owens Drive(North) improvement. <br /> intersection.A funding mechanism for this improvement shall be Community Development <br /> approved by the City prior to the issuance of the first building permit for Department shall ensure <br /> a Phase I use that would generate 100 or more PM peak-hour trips. the implementation of <br /> improvements and <br /> determine funding <br /> mechanism. <br /> Mitigation Measure 4.D-lc:Johnson Drive at Stoneridge Drive Full Buildout The site developer shall Site developer Develop the funding Prior to granting Verified by: <br /> Intersection.Prior to the granting of a certificate of occupancy for the not including contribute fair-share Community mechanism,the calculation of, certificate of Date: <br /> first use in Phase I that would generate 100 or more PM or Saturday Phase I funds for traffic impact Development and receipt of payment. occupancy. <br /> peak-hour trips,the City shall ensure the implementation of the following fees or construct the Department <br /> improvements: improvement. <br /> 1. Construct a third eastbound left-turn lane from Stoneridge Drive to Community <br /> Johnson Drive in conjunction with an additional northbound receiving Development <br /> lane on Johnson Drive(north side of intersection). Department shall ensure <br /> 2. Construct an additional southbound right-turn lane on Johnson Drive. the implementation of <br /> improvements and <br /> 3. Rebuild Johnson Drive as a six lane facility with three or four determine funding <br /> southbound lanes and three northbound receiving lanes for a mechanism. <br /> minimum of 700 feet north of Stoneridge Drive.This improvement <br /> would require widening of Johnson Drive north of Stoneridge Drive <br /> by up to 36 feet and widening of Johnson Drive south of Stoneridge <br /> Drive a commensurate amount to align travel movements through <br /> the intersection. <br />