Laserfiche WebLink
Site(s) Implementation Monitoring Monitoring and Reporting Monitoring Verification of <br /> Mitigation Measures Affected Procedures Responsibility Action Schedule Compliance <br /> equipment redesign, use of intake silencers,ducts,engine grading and of this measure into grading permit, <br /> enclosures,and acoustically-attenuating shields or shrouds). construction plans. specifications. whichever is first. <br /> • Impact tools(e.g.,jack hammers,pavement breakers,and rock Community Development Field inspections <br /> drills)used for construction shall be hydraulically or electrically Department: Inspect site during during <br /> powered where feasible to avoid noise associated with construction to ensure construction. <br /> compressed air exhaust from pneumatically powered tools.Where compliance with project <br /> use of pneumatic tools is unavoidable,an exhaust muffler on the construction plans. <br /> compressed air exhaust shall be used;this muffler can lower noise <br /> levels from the exhaust by up to about 10 dBA.External jackets on <br /> the tools themselves shall be used where feasible;this could <br /> achieve a reduction of 5 dBA.Quieter procedures,such as use of <br /> drills rather than impact tools,shall be used unless deemed not <br /> feasible by a geotechnical investigation. <br /> Mitigation Measure 4.0-1c:Prior to the approval of the development All Site developer shall Community Review and approve acoustical Prior to the Verified by: <br /> of senior housing projects within the EDZ area,the City shall require prepare an acoustical Development assessment and interior approval of the Date: <br /> site-specific acoustical assessments to determine exposure to existing assessment that adheres Department measures.Verify approved development of <br /> and approved noise sources, impact,and mitigation regarding non- to all specifications of this measures on construction senior housing <br /> transportation sources. Noise exposure shall be mitigated to satisfy <br /> the applicable City Municipal Code criterion using appropriate housing measure. plans. projects. <br /> site design. If noise thresholds in the Inspect site during construction <br /> General Plan and/or to ensure compliance with <br /> Municipal Code are project construction plans. <br /> exceeded,reasonable and <br /> feasible mitigation shall be <br /> required to reduce levels <br /> to City standards. <br /> Mitigation Measure 4.0-1d: For all senior housing proposed for All sites within Developer/s of new Community Review and approve noise Prior to and after Verified by. <br /> development within the EDZ area,the City shall require noise the EDZ senior housing shall Development disclosures and noise complaint the approval of Date: <br /> disclosures and noise complaint procedures for new residents of proposed for ensure noise disclosures Department procedures prior to developer/s the development <br /> these developments,which will include 1)a disclosure of potential senior housing and noise complaint disseminating to senior housing of senior housing <br /> noise sources in the project vicinity:and 2)the establishment of procedures be residents projects <br /> procedures and a contact phone number for a site manager the disseminated to residents Inspect site after occupancy to <br /> residents can call to address any noise complaints. of the senior housing, ensure compliance <br />