• <br /> • Site(s) Implementation Monitoring Monitoring and Reporting Monitoring Verification of <br /> Mitigation Measures Affected Procedures Responsibility Action Schedule Compliance <br /> 4.D.Transportation and Traffic(cont) <br /> A funding mechanism for these improvements shall be approved by the <br /> City prior to the issuance of the first building permit for a Phase I use <br /> that would generate 100 or more PM peak-hour trips. <br /> Mitigation Measure 4.D-1d:Stoneridge Drive Queue Spillback All(Phase I The site developer shall Site developer Develop the funding Prior to granting Verified by: <br /> (Stoneridge Drive and Johnson Drive Improvements).Prior to the and Full contribute fair-share Community mechanism,the calculation of, certificate of Date: <br /> granting of a certificate of occupancy for the first use in Phase I that Buildout) funds for traffic impact Development and receipt of payment. occupancy. <br /> would generate 100 or more PM or Saturday peak-hour trips,the City fees or construct the Department <br /> shall ensure the implementation of the following improvements: improvement. <br /> 1. Modify the Stoneridge Drive at Northbound 1-680 off-ramp to provide Community <br /> a northbound right-turn overlap phase. Development <br /> 2. Construct a second southbound left-turn lane from Johnson Drive to Department shall ensure <br /> Stoneridge Drive. the implementation of <br /> improvements and <br /> 3. Extend the existing westbound right-turn pocket at the Johnson Drive determine funding <br /> and Stoneridge Drive intersection approximately 800 feet east by mechanism. <br /> widening Stoneridge Drive and convert the resulting lane into a <br /> through-right-shared lane. Install lane markings in the curb lane and <br /> adjacent lane indicating 1-680 Northbound Only to reduce lane <br /> changes between Johnson Drive and the northbound on-ramp. <br /> 4. Construct a second on-ramp lane to northbound 1-680 from the <br /> westbound Stoneridge Drive approach.The two lane on-ramp should <br /> be merged to one lane prior to the freeway merge area.The lane <br /> drop will occur over a distance of at least 800 feet,and will require <br /> reconstruction and widening of the bridge at this on-ramp from one to <br /> two lanes,with the merge occurring after the bridge.(Note:This <br /> improvement is within Caltrans right-of-way and requires Caltrans <br /> design review and oversight. <br /> A funding mechanism for these improvements shall be approved by the <br /> City prior to the issuance of the first building permit for a Phase I use <br /> that would generate 100 or more PM or Saturday peak-hour trips. <br /> Mitigation Measure 4.D-2:1-680 Northbound and Southbound All(Phase I The site developer shall Site developer Calculation and receipt of Prior to issuance Verified by: <br /> Ramp Merge/Diverge Areas at Stoneridge Drive.Construct and Full contribute fair-shareCommunity payment. of building Date: <br /> improvements,such as the second phase of 1-680/1-580 interchange Buildout) funds for traffic impactDevelopment permits. <br /> improvements,widening of State Route 84,and other planned fees. Department <br /> roadway system modifications that would relieve freeway congestion Community <br /> in the study area where feasible. Development <br /> Department shall ensure <br /> the implementation of <br /> improvements. <br /> 4.D.Transportation and Traffic(cont.) <br /> Mitigation Measure 4.D-3:Johnson Drive Improvements.The City All(Phase! The site developer shall Site developer Calculation and receipt of Prior to issuance Verified by: <br /> will review design plans for club retail and other traffic-intensive uses and Full contribute fair-share payment. of building Date: <br /> that would be developed as part of Phase 1 and buildout of the EDZ to Buildout) funds for traffic impact permits. <br />