Laserfiche WebLink
r <br /> 2. Implementation of Mitigation Measures 4.B-1 and 4.B-2 set forth in Table <br /> 6-1 of the Final SEIR and listed in the MMRP will ensure that Impact 4.B-1 <br /> would be reduced to a less-than-significant level. These mitigation <br /> measures are hereby incorporated by reference and described below. <br /> Mitigation Measure 4.B-1: All developers of sites within the EDZ area shall ensure <br /> that construction plans include a requirement that the BAAQMD Best Management <br /> Practices for fugitive dust control be implemented.All developers of sites within the <br /> EDZ area are required to implement the following for all construction activities <br /> within the EDZ area,to reduce fugitive dust emissions that would be generated <br /> primarily during soil movement, grading, and demolition activities,but also during <br /> vehicle and equipment movement on unpaved construction sites: <br /> 1. All exposed surfaces(e.g.,parking areas, staging areas, soil piles,graded <br /> areas,and unpaved access roads)shall be watered two times per day. <br /> 2. All haul trucks transporting soil, sand,or other loose material off-site shall be <br /> covered. <br /> 3. All visible mud or dirt track-out onto adjacent public roads shall be removed <br /> using wet power vacuum street sweepers at least once per day. The use of dry <br /> power sweeping is prohibited. <br /> 4. All vehicle speeds on unpaved roads,shall be limited to 15 miles per hour. <br /> 5. All streets, driveways,and sidewalks to be paved shall be completed as soon <br /> as possible. Building pads shall be laid as soon as possible after grading unless <br /> seeding or soil binders are used. <br /> 6. Idling times shall be minimized either by shutting equipment off when not in <br /> use or reducing the maximum idling time to 5 minutes(as required by the <br /> California airborne toxics control measure Title 13, Section 2485 of CCR). <br /> Clear signage shall be provided for construction workers at all access points. <br /> 7. All construction equipment shall be maintained and properly tuned in <br /> accordance with manufacturer's specifications. All equipment shall be <br /> checked by a certified mechanic and determined to be running in proper <br /> condition prior to operation. <br /> 8. A publicly visible sign shall be posted with the telephone number and person <br /> • to contact at the City of Pleasanton Planning Division regarding dust <br /> complaints. This person shall respond and take corrective action within 48 <br /> hours. BAAQMD's phone number shall also be visible to ensure compliance <br /> with applicable regulations. <br /> Site(s) affected: All sites within the proposed Zone. <br /> Mitigation Measure 4.B-2: All developers of sites within the EDZ area that are <br /> located within 1,000 feet of sensitive receptors including church, school, senior <br /> housing, or recreational uses (i.e.,Valley Bible Church and Love&Care Preschool, <br /> Club Sport, or other recreational uses)shall ensure that construction contract <br /> specifications include a requirement that all off-road diesel-powered construction <br /> 18 <br />