Laserfiche WebLink
<br />Resolution No. PC-98-15 <br />Page 5 <br />18. Final inspection by the Planning Department is required prior to occupancy. <br /> <br />19. If archeological materials are uncovered during grading, trenching, or other on-site <br />excavation, all work on site shall be stopped and the City immediately notified. The <br />county coroner and the Native American Heritage Commission shall also be notified and <br />procedures followed as required in Appendix K of the California Environmental Quality <br />Act. A similar note shall appear on the improvement plans. <br /> <br />Building <br /> <br />20. All building and/or structural plans must comply with all codes and ordinances in effect <br />before the Building Department will issue permits. <br /> <br />21. The paving sections for the on-site parking and drive areas shall be designed on the basis <br />of an R -Value test and a traffic index to carry the anticipated traffic loads. This design <br />shall be subject to the approval of the Director of Building Inspection. The minimum <br />paving section shall be 2" A.C. on 6" of A.B. The minimum A.C. pavement slope shall <br />be 1%. For pavement slopes of less than 1%, the surface runoff shall be carried in a <br />concrete gutter to an acceptable point of discharge. The minimum slope for concrete <br />gutter shall be 0.5%. <br /> <br />Fire <br /> <br />22. The development shall meet all requirements of the Pleasanton Fire Code (Chapter 20.24 <br />of the Pleasanton Municipal Code). <br /> <br />23. The site shall be kept free of fire hazards from the start of construction to final inspection. <br /> <br />24. Approval for the number, type and location of fire hydrants shall be subject to the <br />approval of the Fire Chief and the City Engineer. <br /> <br />25. All roads on the site are designated as fire apparatus access roads by the Fire Chief and <br />must be maintained in accordance with Section 10.201 of the Uniform Fire Code and be <br />accessible at all times from the start of construction until the project is completed. Curbs <br />must be painted red or "No Parking" signs provided as required by the vehicle code. <br /> <br />Engineering <br /> <br />26. The applicant shall submit a final grading and drainage plan prepared by a licensed civil <br />engineer depicting all final grades and on-site drainage control measures. This plan shall <br />be subject to the review and approval of the City Engineer and/or the Director of Building <br />Inspection prior to the issuance of any building permits. <br />