Laserfiche WebLink
<br />Resolution No. PC-98-l5 <br /> <br />Page 6 <br /> <br />27. The design for the line, grade, and structural sections for the streets serving this <br />development shall be subject to final review and approval by the City Engineer. <br /> <br />28. The applicant shall include erosion control measures on the final grading plan, subject to <br />the approval of the City Engineer. The applicant is responsible for ensuring that the <br />contractor is aware of such measures. All cut and fill slopes shall be revegetated and <br />stabilized as soon as possible after completion of grading, in no case later than <br />October 15. No grading shall occur between October 15 and April 15 unless approved <br />erosion control measures are in place, subject to the approval of the Building Department. <br />Such measures shall be maintained until such time as permanent landscaping is in place. <br /> <br />29. The developer shall submit a dust control plan or procedure as part of the improvement <br />plans. <br /> <br />30. Any damage to existing street improvements during construction on the subject property <br />shall be repaired to the satisfaction of the City Engineer at full expense to the developer. <br />This shall include slurry seal, overlay, or street reconstruction if deemed warranted by the <br />City Engineer. <br /> <br />31. The applicant's contractor(s) shall obtain an encroachment permit from the City Engineer <br />prior to moving any construction equipment onto the site <br /> <br />32. The applicant shall comply with the City's non-point storm drain ordinance as required by <br />the City Engineer which may include the installation of filters at storm water drain inlets. <br /> <br />33. The applicant shall submit a construction Best Management Practice (BMP) program for <br />review and approval by the Planning Director prior to issuance of any building and/or <br />grading permits. These BMP's shall be implemented by the general contractor and all <br />subcontractors and suppliers of materials and equipment. Construction site cleanup and <br />control of construction debris shall also be addressed in this program. Failure to comply <br />with the approved construction BMP may result in the issuance of correction notices, <br />citations, or a project stop work order. <br /> <br />34. The applicant is responsible for implementing the following measures during all <br />construction phases of the subject project: <br /> <br />a.) Gather all construction debris on a regular basis and place them in a dumpster or other <br />container which is emptied or removed on a weekly basis. When appropriate, use tarps <br />on the ground to collect fallen debris or splatters that could contribute to storm water <br />pollution. <br /> <br />b.) Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement, <br />and storm drains adjoining the project site. During wet weather avoid driving vehicles <br />off paved areas. <br />