My WebLink
|
Help
|
About
|
Sign Out
14
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
110717
>
14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 11:39:33 AM
Creation date
11/1/2017 11:12:32 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/7/2017
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zoning and Uses <br />The parcels within the project area are zoned PUD-G&LI District, PUD-I/C-O District, <br />and I -G-40,000 District. The 12 parcels in the JDEDZ would be rezoned to PUD -C <br />District, which would establish a list of permitted and conditionally permitted uses that <br />would allow a wide range of commercial uses. The proposed uses, as revised by the <br />Planning Commission (Attachment 4, Exhibit A) do not emulate any one existing <br />commercial zoning district within the Pleasanton Municipal Code; rather, they were <br />selected to emphasize retail uses within the project area, allow for commercial diversity, <br />and promote vitality within the project area. Each use was also evaluated and selected <br />to ensure a mix of uses that would be attractive in both the local and regional market, <br />and that would capitalize on the JDEDZ's network of arterial and regionally -significant <br />roadways. The proposed uses include, but are not limited to club retail, hotels, <br />restaurants, bars and brewpubs, microbreweries, food stores, department stores, <br />gymnasiums, and offices. Staff believes these uses will achieve the desired commercial <br />character described in the project goals and objectives above and, accordingly, is <br />recommending approval of the proposed rezoning to PUD -C, subject to the proposed <br />list of uses, as revised by the Planning Commission, in Attachment 4, Exhibit A. <br />As stated above, one of the primary goals of the JDEDZ is to streamline the <br />development review process for new land uses through both completed CEQA <br />documentation and staff -level review processes. Accordingly, the proposed uses that <br />would be most critical to generating economic activity in the area (primarily retail uses) <br />would be permitted (as opposed to conditionally permitted), with any new construction <br />associated with those permitted uses subject to staff -level Design Review and <br />verification of compliance with the recommended design guidelines (Attachment 4, <br />Exhibit B). Staff believes that those uses identified as permitted do not represent uses <br />the City would typically want to place operational controls on due to significant noise, <br />objectionable odors, or activities that could be detrimental to the general health, safety, <br />and welfare of the public and/or to surrounding uses. Moreover, the recommended <br />design guidelines would ensure desirable and attractive buildings, adequate <br />landscaping and site amenities, and signage criteria consistent with typical City <br />standards. By approving certain uses as permitted and allowing new buildings to be <br />review under a staff -level Design Review process (subject to compliance with detailed <br />design guidelines), the entitlement process for many types of projects would be <br />shortened (with potential reductions of 2-6 months off the typical approval process). The <br />streamlined approval process is designed to incentivize the development of new <br />businesses within the JDEDZ — a primary objective of the proposal. <br />As permitted uses, applicants would simply be required to obtain approval of a zoning <br />certificate from the Planning Division (over the counter and typically subject to one -day <br />processing), and, if necessary, submit a staff -level Design Review application which <br />would generally be processed in approximately two to three weeks after receipt of a <br />complete application. Conversely, those uses that would require a Conditional Use <br />Permit and Planning Commission -level Design Review require a public hearing and <br />typically take approximately six to twelve weeks to process after receipt of a complete <br />application. <br />Page 8 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.