Laserfiche WebLink
Significance After Mitigation: Less than Significant <br />Finding: Changes have been incorporated into the proposed Zone that would avoid <br />the significant environmental effect as identified in the SEIR. Mitigation Measure <br />4.E-9, which is incorporated into the proposed Zone, will reduce the significant <br />environmental impact to a less -than -significant level. <br />Facts in Support of Finding: The following facts and mitigation measure indicate <br />that the impact will be reduced to less than significant. <br />1. New development as facilitated on sites within the area of the proposed <br />Zone would increase demand for water. Future water demand resulting from <br />new development has been addressed by Zone 7's capital improvement <br />projects to secure more water. In order to meet future needs, Zone 7 plans to <br />improve conveyance, storage, and groundwater recharge and extraction <br />facilities to accommodate the growth outlined in its customers' general plans, <br />which include the City of Pleasanton. <br />2. Implementation of Mitigation Measure 4.E-9 set forth in Table 6-1 of the Final <br />SEIR and listed in the MMRP will ensure that Impact 4.E -9e would be reduced <br />to a less -than -significant level, and is hereby incorporated by reference and <br />described below. <br />Mitigation Measure 4.E-9: For any project proposed for development within the <br />EDZ, prior to the recordation of a Final Map, the issuance of a grading permit, the <br />issuance of a building permit, or utility extension approval, whichever is sooner, the <br />project developer shall submit written verification from the Alameda County Flood <br />Control and Water Conservation District Zone 7 (Zone 7) or the City's Utility <br />Planning Division that water is available for the project. This approval does not <br />guarantee the availability of sufficient water capacity to serve the project. <br />Site(s) affected: All sites within the proposed Zone. <br />(Draft SEIR, pp. 4.E-35 to 4.E-37.) <br />K. Significant Impacts That Cannot be Mitigated to a Less Than Significant Level <br />The following significant impacts cannot be mitigated to a less -than -significant <br />level, even with the implementation of the identified mitigation measures set forth below. No <br />mitigation measures are feasible that would mitigate these impacts to a less -than -significant level. <br />The City has determined that the impacts identified below are acceptable because of overriding <br />economic, legal, social or other considerations, as described in the Statement of Overriding <br />Considerations presented in Section II, below. <br />1. <br />Air Quality <br />Impact 4.B-2 <br />Uses within the area of the proposed Zone would generate operational emissions <br />37 <br />