Laserfiche WebLink
(Draft SEIR, pp. 4.E-9 to 4.E-14.) <br />5. Cultural Resources <br />Impact 4.E -2b <br />Development facilitated by the proposed Zone has the potential to cause a <br />substantial adverse change in the significance of an archaeological resource pursuant to CEQA <br />Guidelines § 15064.5. <br />The SEIR evaluates the impacts of the proposed Zone on archaeological resources. <br />Some sites that would be developed may have only been minimally disturbed in the past and they <br />may contain unknown archaeological resources, the disturbance of which could therefore cause a <br />substantial adverse change in the significance of a unique archaeological resource pursuant to <br />§ 15064.5 of the CEQA Guidelines. <br />Significance Before Mitigation: Significant <br />Significance After Mitigation: Less than Significant <br />Finding: Changes have been incorporated into the proposed Zone that would avoid <br />the significant environmental effect as identified in the SEIR. Mitigation Measure <br />4.E-5, which has been incorporated into the proposed Zone, will reduce the <br />significant environmental impact to a less -than -significant level. <br />Facts in Support of Finding: The following facts and mitigation measure indicate <br />that the impact will be reduced to less than significant. <br />1. The proposed Zone is located in Holocene -aged alluvial deposits, a geologic <br />formation that has a high potential for buried archaeological resources. <br />Previous disturbance from the channelization of Alamo Creek, construction <br />of the I-680 and I-580 freeways, and existing development throughout the <br />area of the proposed Zone indicates that any sensitivity for buried prehistoric <br />archaeological resources in the area has been significantly reduced; however, <br />unknown archeological resources may be present underground within the <br />area of the proposed Zone. <br />2. Implementation of Mitigation Measure 4.E-5 set forth in Table 6-1 of the <br />Final SEIR and listed in the MMRP will ensure that Impact 4.E -2b would <br />be reduced to a less -than -significant level and is hereby incorporated by <br />reference and described below. <br />Mitigation Measure 4.E-5: Archeological Resources. If prehistoric or historic - <br />period archaeological resources are encountered during ground disturbing activities <br />for a project under construction within the EDZ, the construction contractor shall <br />31 <br />