The project developer acknowledges that the City of Pleasanton does not guarantee the <br />availability of sufficient sewer capacity to serve this development by the approval of this <br />case, and that the project developer agrees and acknowledges that building permit ap- <br />proval may be withheld if sewer capacity is found by the City not to be available. <br /> <br />This approval does not guarantee the availability of sufficient water to serve the project. <br />The City shall withhold building permits for the project if at the time building permits are <br />applied for, mandatory water rationing is in effect, unless the City has adopted a water <br />offset program and unless the project developer is participating in the program. Notwith- <br />standing the project developer's participation in such a program, the City may withhold <br />building permits if the City determines that sufficient water is not available at the time of <br />application of building permits. <br /> <br />10. <br /> <br />The building permit plan check materials will be accepted for submittal only after com- <br />pletion of the 15-day appeal period, measured from the date of the approval letter, unless <br />the project developer submits a signed statement acknowledging that the plan check fees <br />may be forfeited in the event that the approval is overturned on appeal, or that the design <br />is significantly changed as a result of the appeal. In no case will a building permit be is- <br />sued prior to the expiration of the 15-day time-period. <br /> <br />Planning Requirements: <br /> <br />11. <br /> <br />All conditions of approval for this case shall be written by the project developer on all <br />building permit plan check sets submitted for review and approval. These conditions of <br />approval shall be on, at all times, all construction plans kept on the project site. It is the <br />responsibility of the building developer to ensure that the project contractor is aware of, <br />and abides by, all conditions of approval. Prior approval from the Planning Depmhuent <br />must be received before any changes are constituted in site design, building design, etc. <br /> <br />12. <br /> <br />The project developer shall use their best efforts to implement the measures identified in <br />the U.S. Green Building Council's (USGBC), "Leadership in Energy and Environmental <br />Design (LEED)" 2.0 rating system in the design, construction, and operation of the pro- <br />posed building. Before issuance of a building permit, the LEED measures detailed in <br />"LEED Green Building Rating System" dated August 5, 2003", and approved by the City <br />Council shall be explicitly called out a separate sheet of the building permit plan set and <br />shall be subject to review by .the Planning Director. <br /> <br />13. <br /> <br />The project developer shall submit a waste management plan to the Building and Safety <br />Division prior to issuance of building or demolition permits. The plan shall include the <br />estimated composition and quantities of waste to be generated and how the project devel- <br />oper intends to recycle at least 50% of the total job site construction and demolition waste <br />measured by weight or volume. Proof of compliance shall be provided to the Chief of <br />Building and Safety prior to the issuance of a final building permit. During demolition <br />and construction, the project developer shall mark all trash disposal bins "trash materials <br /> <br />PUD-93-2-SM,, Final CC Conditions Page 2 of lO September 2, 2003 <br /> <br /> <br />