Laserfiche WebLink
County 30 business days before the start of the next installment period and the billing <br />dates reflected meet that requirement. <br />Additionally, the Amendment stipulates that the City accept ownership from County <br />EMS, at no cost, of five (5) LIFEPAK 15 systems and five (5) Physio -Control chest <br />compression system (LUCAS Devices) that, in the original agreement, were owned and <br />maintained by County EMS. County EMS will continue to fund the service plan on <br />these devices through the end of the Amendment, June 30, 2018, at which time it <br />should be assumed that this responsibility will be transferred to the City. A brief <br />description of each device follows: <br />o LIFEPAK 15 System <br />■ EMS standard equipment; monitor and defibrillator with <br />communication ability to hospital. <br />■ The five (5) units are currently in good working order. <br />■ Each system has a replacement cost of approximately $30,000 <br />each. Replacement is on an as -required basis (unit no longer <br />passes annual service certification; damaged etc.). <br />■ Annual service is currently costed at $1,700 per unit. Total annual <br />service for all 5 units is $8,500. <br />o Physio -Control chest compression system (LUCAS Device). <br />■ EMS standard equipment; portable chest compression system. <br />■ The five (5) units are currently in good working order. <br />■ Each system has a replacement cost of approximately $16,000 <br />each. Replacement is on an as -required basis (unit no longer <br />passes annual service certification; damaged etc.). <br />■ Annual service is currently costed at $400 per unit. Total annual <br />service for all 5 units is $2,000. <br />It should be assumed that the service requirements associated with this equipment will <br />be transferred to the City at the end of the extension term, June 30, 2018, at an <br />estimated total annual cost of $10,500. Additionally, a replacement schedule and <br />funding should be identified, at the per-unit replacement costs noted above, in the <br />capital replacement budget. <br />Page 2 of 3 <br />