My WebLink
|
Help
|
About
|
Sign Out
PC 072215
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
MINUTES
>
2010-2019
>
2015
>
PC 072215
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2017 4:50:43 PM
Creation date
8/10/2017 4:41:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
7/22/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Commissioner Balch asked staff to remind the Commission when the time comes to <br />recommend priorities so the Commission can consider recommending this as <br />something it would wish to look at doing. <br />Mr. Weinstein said yes. He added that another thing to keep in mind is that the City is <br />going to be hiring a consulting firm to look at developing a new parking supply in <br />Downtown and elsewhere, and as part of that, there will be some kind of study about <br />the demand for parking currently in Downtown to ascertain where the appropriate <br />locations are for parking and how the existing demand can be met. He added that <br />some of the concerns Commissioner Balch is expressing could be addressed in that <br />study as well. <br />Lund Ranch II Proiect <br />Commissioner Balch stated that he was not at the last Commission meeting, but the <br />Commissioners were talking about what they would like to see come before the <br />Commission when the Lund Ranch II project comes back for consideration. He <br />indicated that he understands that staff probably has a laundry list of things to be <br />brought back to the Commission, but he is formally requesting that staff also give the <br />Commission an example of how much 11,000 cubic yards of dirt is. <br />Commissioner Piper requested verification that the next Planning Commission meeting <br />is on August 12th, which is actually three weeks away. <br />Mr. Weinstein replied that is correct. <br />Commissioner Balch indicated that he will not be at that meeting. <br />Commissioner Piper inquired if the Agenda for that meeting will include the Lund Ranch <br />II item. <br />Commissioner Balch said no. <br />Mr. Weinstein confirmed that the Lund Ranch II item is scheduled for the second <br />meeting in August, August 26th. He indicated that there is currently at least one item <br />scheduled for the August 12th meeting: the Ponderosa Centerpointe project at Valley <br />Avenue and Busch Road for 27 single - family residential units and a Conditional Use <br />Permit for changes in operation at an existing school on the site. <br />Commissioner Ritter stated that at the last Commission meeting where not all the <br />Commissioners were present, he mentioned that for the Lund Ranch II project, granted <br />that his vote is an opinion, he would hope that staff would come with something based <br />on the feedback at the last meeting at which the proposal was considered, to maybe <br />modify or change where the Commission could get more than a 3 -2 vote because it is <br />also going before the City Council, who will be deciding the net end. <br />PLANNING COMMISSION MINUTES, July 22, 2015 Page 12 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.