My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
081517
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2017 3:14:47 PM
Creation date
8/9/2017 11:14:44 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/15/2017
DESTRUCT DATE
15Y
DOCUMENT NO
09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Deliverables: <br /> • Encroachment Permit Application (6 hardcopies) <br /> • 95% Plans(6 full size sets) <br /> • 95% Project Specifications (6 hard copies) <br /> • 95% Engineer's Estimate (6 hard copies) <br /> • Final Design Exception Fact Sheet(6 hard copies) <br /> • BMP DPP-1 Checklists (no change from previous submittal) (6 hard copies) <br /> • Comment Resolution Matrix(6 hard copies) <br /> TASK 4—Prepare Final Bid Documents <br /> 4.1 Prepare 100%Roadway Plans <br /> All comments received from the City and Caltrans on the 95% PS&E/Encroachment Permit <br /> submittal will be incorporated into the 100%roadway plans.The 100%Plans submittal shall <br /> address all review comments and will represent the complete final design,with all design plans <br /> and details present. Any additional work resulting from new comments that changes the design <br /> significantly may be considered as Extra Work. The comment resolution matrix will be updated <br /> and submitted with the 100% plans. <br /> The following roadway plans will be included: <br /> • Title Sheet with Location Map(1 Sheet) <br /> • Typical Sections(1 Sheet) <br /> • Layouts (2 Sheets) <br /> Y Construction Details (Including contour grading and pavement elevations) (5 Sheets) <br /> • Water Pollution Control Plans (2 Sheets) <br /> • Drainage and Utility Plans (including pothole data) (4 Sheets) <br /> • Signing and Striping plans (3 Sheets) <br /> • Stage Construction/Traffic Handling Plans (7 Sheets) <br /> 4.2 Prepare 100%Traffic Signal/Electrical Plans <br /> TJKM will update the traffic signal/electrical plans to incorporate City and Caltrans comments. <br /> Responses to comments on TJKM's plans, specifications and estimate will be incorporated into <br /> the comment resolution matrix. <br /> 4.3 Prepare 100%Construction Estimate <br /> Quincy will update contract quantities and corresponding construction cost estimates based on <br /> revisions from the 100%submittal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.