assumed to be sufficient and will not be analyzed. The depth of the pipelines in the project area <br /> will be determined to confirm that there will not be a conflict with the grading plane of the <br /> widened roadway section. Our stormwater run-off calculations and design will confirm the <br /> conveyance to and capacity of existing drain inlets. The existing drainage patterns are expected <br /> to be maintained. Drain inlets will be added, modified, or replaced as necessary to accommodate <br /> the road widening and modified curb returns. Storm water pollution prevention measures will be <br /> incorporated per Caltrans Design Pollution Prevention BMP DPP-1 checklists. <br /> The following 65% roadway plan sheets will be submitted: <br /> • Title Sheet with Location Map(1 Sheet) <br /> • Typical Sections(1 Sheet) <br /> ▪ Layouts (2 Sheets) <br /> • Construction Details(Including contour grading and pavement elevations) (2 Sheets) <br /> • Water Pollution Control Plans (2 Sheets) <br /> • Drainage and Utility Plans (including pothole data) (3 Sheets) <br /> • Signing and Striping plans (3 Sheets) <br /> • Stage Construction/Traffic Handling Plans (3 Sheets) <br /> Quincy will create the plan sheets in AutoCAD 3D 2015 format. <br /> 2.4 Prepare 65%Traffic Signal/Electrical Plans <br /> TJKM will prepare electrical plans for modification of the traffic signals at the Hopyard Rd/Owens <br /> Drive intersection, including relocation of the signal pole at the pork chop island at the SE <br /> quadrant. Bicycle detection will also be incorporated into the design. <br /> 2.5 Prepare Design Exception Fact Sheet <br /> Quincy will prepare the Design Exception Fact Sheet and submit to Caltrans for approval. It is <br /> anticipated that two submittals of the Fact Sheet will be required. <br /> 2.6 Prepare 65%Construction Estimate <br /> Quincy will prepare contract quantities and corresponding construction cost estimates and <br /> update them for each submittal. Contract quantities will be developed for each discrete item of <br /> work. Caltrans Construction Cost Database or other databases, as directed by the City,will be <br /> used to estimate item prices. Project estimates will show individual pay items, quantities,and <br /> costs as well as a project cost summary, including appropriate supplemental work items and <br /> contingencies. <br /> 2.7 Prepare Specifications <br /> To expedite Caltrans approval, Quincy will prepare project specifications in Caltrans format, in <br /> conformance with the 2015 Caltrans Standard Specifications and Standard Special Provisions. <br /> P(tg-c 5 of 10 <br />