Laserfiche WebLink
Pleasanton Fire Station 3 Proposal <br /> June 20, 2017 <br /> Page 3 <br /> These drawings will include color and material callouts, as well as a colored building <br /> elevation drawing. No models are included in this submittal. <br /> + Make required presentations to various agency review organizations to review <br /> proposed design. Proposal assumes two City/community presentations. <br /> + Make required modifications to Schematic Design to obtain Schematic Design <br /> approval. <br /> + After obtaining written approval of Schematic Design we will proceed into Design <br /> Development. <br /> + Attend progress meetings with City staff(assume 2 meetings for this phase). <br /> DESIGN DEVELOPMENT PHASE <br /> + Refine design of Floor Plans, Building Elevations and Site Plan. <br /> + Develop structural foundation and framing plans. <br /> + Develop building mechanical, plumbing and electrical plans. <br /> + Coordinate with Owner systems for phone/data/cable requirements. <br /> + Prepare preliminary Interior Elevations, Building Sections, Reflected Ceiling Plan and <br /> Roof Plan. <br /> + Prepare preliminary interior material and color boards for review and selection. <br /> + Develop Preliminary fixture and furniture layouts. A detailed FFE package is not a <br /> part of the current scope of services. <br /> + Prepare Storm Water Prevention Plan in accordance with City requirements. <br /> + Develop preliminary line item Construction Cost Estimate based on actual building <br /> components. This estimate will be more detailed than the systems estimate prepared <br /> during schematic design. <br /> + Make required submittal to the City for Design Development Review. <br /> 280 Bettencourt Street, Sonoma, CA 95476 <br /> www.jel'fkatzarchitecture.com <br />