Laserfiche WebLink
EXHIBIT'B-2' MASTER PLAN -SITE PLAN AND ARCHITECTURE CONCEPTUAL DESIGN <br /> Fee Estimate-Discipline Breakdown by Task. <br /> Page 3 1 <br /> Structural Eng'r $0 <br /> T ----1 <br /> Survey Crew 1 $0 $01 <br /> (8) @ $278/hr j ' <br /> ' 1 <br /> Code Consultant ; $01 , <br /> i $0 <br /> $22/hr _ _! <br /> I I <br /> i <br /> Expenses $6,000.00; $2,000.00[ ••1 000.00 $9,000.001 <br /> TOTAL , $39,486.001 $17,920.00 $12,356.00 69,762.001 <br /> *Task included coordination with structural engineer, conceptual structural design,schematic building systems layout,conceptual egress and <br /> soccupancy analysis. <br /> MD Fotheringham, Landscape Architects, Inc. Updated: 3/9/17 <br />