Laserfiche WebLink
EXHIBIT'B-2' MASTER PLAN -SITE PLAN AND ARCHITECTURE CONCEPTUAL DESIGN <br /> Fee Estimate- Discipline Breakdown by Task. <br /> Page 21 <br /> I Final Master Plan Preparation <br /> !Learning sin Center Concept _... 4 0 8 24 0, <br /> _ <br /> Desi $5,212.00! <br /> 0; <br /> jAuxilliary Buildings Concept I I p �1 <br /> IDesign 141 0 4 16 0 04 $3,452.001 <br /> !Updated Grading& <br /> Drainage Plan/Utility <br /> Demand 0 I 0i 0 0 2 8j $1,768.00 <br /> 1 <br /> I Updated Storm Water <br /> I Design/Parking & <br /> Circulation Design 4 8; 0, 0 4 81 $1788.00 <br /> f i 1 1 <br /> (Revised Landscape Concept <br /> !Design/Fencing, Planting, <br /> I Gathering,Open Space 8' 40! 0 1 0, 0 0( $5,864.00 <br /> Final Master Plan Text . I <br /> Update&Assemble Booklet I 16 401 41 0 4 4 _$9,624.00 <br /> {Cost Estimates 4 81 2 4 2 J, $3,580.00 <br /> j!Subtotal: _ ! $33,288.00 <br /> City Staff and Design Team : <br /> E <br /> Meetings(3/3) ' 6 1 6_ 6 i <br /> 5 6; 0 $4,902. <br /> ! -7 00 <br /> ^ 1 i <br /> (Public Hearings (4) 121 61 12; 12 12 0P $9,144.00 <br /> ITotal Fee/Staff _ • $15,006.00; $18,480.001 $8,000.00 $7,920.00 $6,936.00 $4,420.00 $60,762.00 <br /> r� <br /> !Total Fee/Firm $33,486.00; I $15,920.00 $11,356.00 <br /> ;SUBTOTAL 1 <br /> MD Fotheringham, Landscape Architects, Inc. Updated: 3/9/17 <br />