My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
032117
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2017 4:08:52 PM
Creation date
3/15/2017 1:28:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/21/2017
DESTRUCT DATE
15Y
DOCUMENT NO
13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
confirm creek setbacks and development setbacks to facilitate refinements to the site plans for <br /> both Sub-area 7 and Sub-area 16. <br /> MS will provide text to the Design Team for incorporation into the master plan document <br /> describing the stormwater intent - water quality, detention, retention and hydro-modification <br /> concepts - sewer concepts, and water and fire water service requirements that need to be <br /> incorporated into the Project as it relates to the conceptual design.They will assist in preparing <br /> cost estimates for site improvements and attend public hearings as needed. <br /> The Design Team will work together to prepare final graphics, written descriptions, tables and <br /> other exhibits to be updated in the Final Master Plan booklet. <br /> Update to the Farm Program <br /> The primary purpose of the Final Master Plan is to identify and locate the various agricultural <br /> and community garden uses on two parcels in the Phase II Bernal Property Specific Plan — Sub- <br /> areas 7 and 16.The revised land use program is as follows: <br /> We anticipate an amended community farm program with the following program elements: <br /> • Outdoor gathering space including picnic and grill facilities; <br /> • Community gardens with both individual plots and larger community plots; <br /> A multi-crop program coordinated through a yet to be identified community <br /> group and/or non-profit organization; <br /> •Vineyards maintained by a yet to be identified community group and/or non-profit <br /> organization; <br /> Orchards with fruit and/or nut trees; <br /> • Storage facilities for Farm operation and maintenance equipment; <br /> • A community building or learning center on the Sub-Area 7 site.The building is to <br /> serve as a meeting place for community gatherings, classrooms, etc. (This <br /> building would be similar to the assembly building in the current draft master <br /> plan; justification for such a building is a key component of the Master Plan) <br /> • Composting and other various recycling activities; <br /> • Parking and site emergency vehicle access; <br /> Pleasanton Community Farm-Revised Proposal-MD Fotheringham, Landscape Architects, Inc. page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.