Laserfiche WebLink
PROJECTTITLE: CALLIPPE PRESERVE GOLF COURSE <br />Pleasanton, CA JMP Golf Design Group <br />Attachment *2 <br />HOLE #8 & # 9 BUNKER RENOVA71ON BID SCHEDULE <br />ITEM <br />NO. <br />Description of Item <br />ESTIMATED <br />QUANTITY <br />UNIT <br />UNIT <br />PRICE <br />AMOUNT <br />1 <br />MobilIzation <br />Lump Sum <br />L.S. <br />Lump Sum <br />$ 1,000.00 <br />2 <br />Removal of Bunker Send, Grovel & Drain Pipe <br />H8 Back Greenside Pot <br />647 <br />S.F. <br />$ 1.95 <br />$ 1,261.65 <br />Hg Front RIghtGreenslde <br />2,388 <br />S.F. <br />$ 1.95 <br />$ 4,617.60 <br />$ 1.95 <br />$ L965.60 <br />49 Back LeftGreenside <br />1,008 <br />S.F. <br />3 <br />Turf Removal and DisposaltN ulte <br />Up to 8 R. around perimeter. <br />Intl Pg 1 <br />L.S. <br />See Pg 1 <br />See Pg 1 <br />See Notes Page 1 for Project Allowance <br />4 <br />Better Silty BunkerConstruction <br />Ind. all new drain pipe, gravel, polymer, sand <br />Clean & re aStabttsh firm edge. Includes +1 D% <br />H8 Back Greenside Pot <br />H9 Front RightGreen8lde <br />H9 Back Left Greenside <br />647 <br />2,388 <br />1,008 <br />S.F. <br />S.F. <br />S.F. <br />$ 8.15 <br />$ 5_ .273.05 <br />$ 8.15 <br />$ 19.299.20 <br />$ q.21 s.2n <br />$ 8.15 <br />tt <br />AqueSmart Pro Polymer Coated Sand <br />Tilled 3" Deep Q 80 tbs. f1000ef <br />75 <br />1000 SF <br />$ Included <br />$ <br />above <br />8 <br />Irrigation Sub - Surface Drip System <br />H8 Back Greenside Pot - Not Required <br />H9 Front Right Greenside -1000' Kit <br />0 <br />2 <br />EA. <br />EA. <br />$ 0.00 <br />$1.00 <br />$ 5,000 <br />$ 2500.00 <br />H9 Back Left Greenside - 500'Kit <br />f <br />EA. <br />$ 1.750.00 <br />$ 1,750.00 <br />7 <br />Amendments, Fertilizer& Seedbed Prep. <br />Owner Purchased & Delivered to Site <br />Contractor to Apply & Incorporate Into Sob <br />Ind Pg 1 <br />L.S. <br />See Pg 1 <br />See Pg 1 <br />8 <br />Sod - Purctwse.'Dellvery . &Installation <br />H8 Back Greenside Pot <br />Hg Front RfghtGreenside <br />480 <br />1,808 <br />S.F. <br />S.F. <br />$ 432.00 <br />$ .90 <br />$1,625.40 <br />$ .90 <br />$179.50 <br />H9 Back Left Greenside <br />765 <br />S.F, <br />BID -TOTAL OF ALL ELEMENTS THIS PAGE $51,119.20 <br />USING SCRIPT -$ Fifty One Thousand One Hundred Nineteen Dollars and 20/100 Cents <br />Company: p g j3 r 4 ,jnC. Date: 9127/2016 <br />Signature: I Name 171110: Jay F_.. Ramos. Vice President <br />Page <br />