My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
022117
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 12:58:52 PM
Creation date
2/16/2017 1:34:36 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/21/2017
DESTRUCT DATE
15Y
DOCUMENT NO
05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />Bidder to pct form all of the work described in the Contract Documents for the total bid <br />amount entered. Attachments #1, #2, & #3 shag be submitted with bid. <br />PROJECTTRLE: CALLIPPE PRESERVE COURSE <br />Pleasanton, CA JMP Doll Design Group <br />Attachment #1 <br />HOLEV3 BUNKER RENOVATION BID SCHEDULE <br />ITEM <br />Description of Item <br />ESTIMATED <br />UNIT <br />UNIT <br />AMOUNT <br />NO. <br />QUANTITY <br />PRICE <br />1 <br />Mobilization <br />Lump Sum <br />L.S. <br />Lump Sum <br />$11 too, 00 <br />Removal of Bunker Sand, Gravel & Drain Pipe <br />1st Left of Green <br />2nd Left of Omen <br />3rd Back Left of Green <br />2,762 <br />1,741 <br />1,276 <br />S.F. <br />S.F. <br />S.F. <br />1 1.95 <br />$5424.90 <br />$ 3324-9S <br />$ Z Asa =n <br />$ 1.95 <br />$ 1.95 <br />3 <br />Turf Removal and Dlsposa101Qsite <br />Up to 8 R around perimeter. <br />7,50D <br />S.F. <br />$ .30 <br />$ 2,250.00 <br />Prof ect Allowance - 2 loads -toted 24 tons <br />4 <br />Better Billy SunkerConstrucdon <br />Incl. all new drain pipe, gravel, polymer, sand <br />Clean & re- establish firm edge. Includes +10% <br />let Left of Green <br />2,782 <br />S.F. <br />$ 8.15 <br />$_2,673 30 <br />S 8.15 <br />2nd Left of Green <br />1,741 <br />S.F. <br />$ 14,189.15 <br />$ 8.15 <br />$_ 10.399.40 <br />3rd Back Left of Green <br />1,276 <br />S.F. <br />5 <br />AqueSmart Pro PotymerCosted Sand <br />Tilled 3' Deep Q rate of 80 ibs. /1000sf <br />7,500' <br />S.F. <br />$ •40 <br />$3,000.00 <br />6 <br />Irrigation Sub-Surface Drip System <br />1 at Left of Green -1 ODO' KIt <br />2 <br />EA. <br />$ 2.500.00 <br />$ 5,000.00 <br />$2,500.00 <br />2nd Left of Green - 1000' Kit <br />2 <br />EA. <br />$ 5,00o.00 <br />$ 1.750.00 <br />$ 1.750"Oo <br />3rd Beck Left of Grow - 600' Kit <br />1 <br />EA. <br />7 <br />Amendments, Fertilizer & Seedbed Prep. <br />Owner Purchased & Delivered to project <br />7,500 <br />S.F. <br />$ .20 <br />$ 1,500.00 <br />Contractor Apply & Incorporate Into Son <br />8 <br />Sod - Purchase, Delivery & Installation <br />tat Leff of Green <br />2,167 <br />S.F. <br />$ .90 <br />$_1,968.30 <br />$ .90 <br />$.1,181.70 <br />2nd Lelt of Green <br />1,313 <br />S.F. <br />$ _907"1111— <br />3rd Bade Left of Green <br />959 <br />S.F. <br />BID -TOTAL OF ALL ELEMENTS THIS PAGE $ 82,083.00 <br />USING SCRIPT -$ Eighty Two Thousand Eiehry Three Dollars and 0 /100 r:mts <br />Company-, D.H.R. Construction, Inc. oats: 9/27/2016 <br />Signettae 'c'-- Name / Tide: Joy E. Ramos, Vice President <br />Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.