Laserfiche WebLink
OR-OJECT TITLE: CALUPPE PRESERVE OOLFCOURSE <br />Item Description <br />Amount <br />Pleasanton, CA <br />imp Gott Design Group <br />$82,083.00 <br />Attachment #3 <br />HOLE #8 & #e BUNKER RENOVATION BID SCHEDULE <br />551,119.20 <br />HOLE #3, #8 & W9 BUNKER R NOVA I ON BID SCHEDULE <br />HOLE #3,#8 & #9 BUNKER RENOVATION BID SCHEDULE <br />$133,202.20 <br />X-d—dMonal unn ce inroffnation <br />Ted <br />ITEM <br />Description of item <br />ESTIMATED <br />UNIT <br />UNIT <br />A <br />NO. <br />QUANTITY <br />PRICE <br />1 <br />GOV Drainage (Includingldtings) <br />a. 4" Solid Drainage Line <br />L.F. <br />14.00 <br />b. 8" Solid Drainage Una <br />L.F. <br />$ 16.00 <br />C. SW Washed Pea Gravel <br />TON <br />39.50 <br />2 <br />Bunker Components <br />9. BBB 205 Bunker Sand from TMT Ent <br />TON <br />S LD0 <br />3 <br />Drain Line Flush With Valve Box Cover - See Detail <br />EA <br />$ 25000 <br />Confirm presence of clean-out. It notpresent <br />Install par detail. <br />BID -TOTAL OF ALL ELEMENTS PAGES 1 & 2 $ 133,202.20 <br />USING SCRIPT - $ One Hundred Thirty Three Thousand Two Hundred Two Dollars <br />and 201100 Comm <br />Company: . Inc Date: 9127/2016 <br />Signature: Name J Title: Joy B. Ramos. Vice <br />President <br />Item <br />NO. <br />Item Description <br />Amount <br />1, <br />HOLE93 BUNKER RENOVATION BID SCHEDULE <br />$82,083.00 <br />2, <br />HOLE #8 & #e BUNKER RENOVATION BID SCHEDULE <br />551,119.20 <br />3, <br />HOLE #3,#8 & #9 BUNKER RENOVATION BID SCHEDULE <br />$133,202.20 <br />Ted <br />5133 20220 <br />Note: The Bidder acknowledges that the total amount set forth above is for the entire <br />project as represented by the Contract Documents regardless of itemization. <br />Page 7 <br />