My WebLink
|
Help
|
About
|
Sign Out
12a
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
020717
>
12a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2017 10:33:40 AM
Creation date
2/1/2017 10:58:21 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/7/2017
DESTRUCT DATE
15Y
DOCUMENT NO
12a
Document Relationships
12a ATTACHMENT 08
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2017\020717
12a ATTACHMENT 08 TREE REPORT
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2017\020717
12a ATTACHMENT 09
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2017\020717
12a ATTACHMENT 09 FIRST CARBON SOLUTIONS
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2017\020717
12a ATTACHMENT 10
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2017\020717
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
noise mitigation for this project prevents compliance with this requirement In addition, <br /> simulated mullions must appear real and be on both sides of the glass Windows of new <br /> structures shall be recessed two inches, with wood trimmed windowsills Manufacturer's <br /> specification sheets, details, and sections of the windows, and window treatments (sills, <br /> trim, etc ) shall be shown on the building permit plans and shall be subject to review and <br /> approval by the Director of Community Development prior to issuance of the first building <br /> permit <br /> 9 Final color, roofing, and material samples shall be submitted to the Director of Community <br /> Development for review and approval before issuance of the first building permit <br /> 10 Unless approved by the Director of Community Development and City Engineer, no <br /> grading/building permits shall be issued prior to City Council approval of the tentative map <br /> and recordation of a final map <br /> 11 The applicant shall obtain all necessary permits from the City prior to relocating the Zia <br /> home on-site <br /> 12 Any damage to the exterior of the Zia home, that results from the relocation of the home or <br /> removal of the later additions shall be replaced and shall match the details, material, color, <br /> etc of the existing home The plans submitted to the Building and Safety Division for plan <br /> check and permit issuance shall include existing and proposed floor plans and elevation <br /> drawings and clearly indicate the extent of the area to be removed and what materials, <br /> details, colors, etc will be used to seamlessly integrate the repaired exterior walls where <br /> the addition was removed The colors, details, and materials of the repair work shall be <br /> subject to the review and approval of the Director of Community Development prior to <br /> issuance of building permits <br /> 13 At the time of recordation to subdivide the project site into 87 lots and 13 parcels, the <br /> applicant/project developer shall record Conditions, Covenants and Restrictions (CC&Rs) <br /> which shall create a Homeowner Association for the development The type of association <br /> established shall be subject to the approval of the City Engineer and Director of Community <br /> Development prior to the first plan check submittal of the final map The association shall be <br /> responsible for the maintenance of all common utilities and stormwater treatment <br /> measures/areas, the trail along the south side of Nevada Street, the portion of the Arroyo del <br /> Valle that is located within the project site, private streets, parking, parks, the Zia Home, the <br /> relocated tower, all signage, landscaping and irrigation including landscaping within the <br /> public right-of-way The private homes and private landscape shall be the responsibility of <br /> the individual owner for the lot The CC&Rs shall be subject to the review and approval of <br /> the City Attorney prior to recordation of the final map The City shall be granted the rights <br /> and remedies of the association, but not the obligation, to enforce the maintenance <br /> responsibilities of the association <br /> A plan clearly showing these areas of association-owned and maintained facilities shall be <br /> submitted for review by the Director of Community Development and City Engineer prior to <br /> recordation of the final map The CC&Rs shall be recorded with the final map for the <br /> project <br /> PUD-110, Irby Ranch City Council <br /> Page 3 of 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.