My WebLink
|
Help
|
About
|
Sign Out
14
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
122016
>
14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2016 11:38:46 AM
Creation date
12/14/2016 3:23:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/20/2016
DESTRUCT DATE
15Y
DOCUMENT NO
14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOMME CA,ROCC:28,A <br /> AESEDODA,TES ONC <br /> STRUCTURAL ENGINEERS ATTACHMENT 4 <br /> aes Tha Alameda <br /> San Jose CA 95128-3133 <br /> Telephone 409-296-5515 <br /> Facsimile 40E3-296-8114 November 29, 2016 <br /> 2013122 8 <br /> City of Pleasanton <br /> 200 Old Bernal Avenue <br /> P O Box 520 <br /> Pleasanton, CA 94566-0802 <br /> Attention Mr Adam Nelkie <br /> Subject Bridge Painting for the Bernal Avenue Bridge over Arroyo de la Laguna <br /> Federal ID 5101(028) <br /> Task 8 - Construction Services Proposal <br /> Dear Adam <br /> Biggs Cardosa Associates, Inc is pleased to submit the following cost proposal to provide construction <br /> engineering services on the subject project <br /> This proposal covers the following services <br /> A Project Management while performing Construction Support Services <br /> B Attend pre-construction meeting <br /> C Performing the review of structural shop drawings and structural submittals required by the <br /> project specifications as noted in the following list We have assumed that any civil related <br /> submittals, bridge painting submittals, and schedule submittals will be reviewed by the City's <br /> painting inspection company or by City staff <br /> I Scaffolding Submittal <br /> 2 Vehicular and Pedestrian Enclosure Submittal <br /> 3 Species Protection Submittal <br /> D Respond to RFis and developing associated CCOs to clarify the construction documents during <br /> construction <br /> E Provide Record Drawings based on Contractor's red-lined changes The Record Drawings will be <br /> drafted using_AutoCAD per the current Caltrans Structures guidelines <br /> We propose to provide the requested design scope of services on a time and materials basis, not to <br /> exceed 513,900, including expenses <br /> Our billing rates and reimbursable expenses are per the attached rate schedule Please note that rates <br /> shown are current for the period 10/01/2016 to 09/30/2017 Biggs Cardosa Associates adjusts rates every <br /> year effective October 1 Rates for subsequent years(starting on 10/01/2017)will be per our standard <br /> billing rate schedule for that year, but in no event will rates increase at more than 3% per year <br /> EJ <br /> W .0 - . <br />
The URL can be used to link to this page
Your browser does not support the video tag.